Revision history of "Extension, reconstruction and modernisation of sanitary sewage treatment plants and drainage pumping plants in Bircza" (Q118884)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 18:1918:19, 9 October 2024DG Regio talk contribs 96,034 bytes +4 Changed label, description and/or aliases in pt
  • curprev 18:1918:19, 9 October 2024DG Regio talk contribs 96,030 bytes −108 Set a claim value: summary (P836): O objetivo direto do projeto é: • Aumentar a capacidade das estações de tratamento de águas residuais de 250 m3/dia para 560 m3/dia, • introduzir tecnologias modernas de tratamento e controlo automatizado do processo de tratamento de águas residuais urbanas, • aumentar a eficiência do tratamento de águas residuais urbanas, • permitir a ligação de novos clientes à rede de esgotos, reduzindo assim os encargos e os custos de exportação de fossas, • mel...

7 March 2024

15 January 2024

13 December 2023

11 June 2023

24 May 2023

2 March 2023

  • curprev 19:5119:51, 2 March 2023DG Regio talk contribs 92,964 bytes +1,810 Changed label, description and/or aliases in lv, it, da, sk, fi, et, cs, de, lt, ga, hr, ro, sl, sv, pt, fr, es, el, nl, mt, hu, bg, and other parts

26 October 2022

20 October 2022

2 July 2022

  • curprev 17:5117:51, 2 July 2022DG Regio talk contribs 89,041 bytes +58,418 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:3207:32, 2 December 2021DG Regio talk contribs 17,751 bytes +3,152 Created claim: summary (P836): L’objectif direct du projet est de: • augmenter la capacité de la station d’épuration de 250 m³/jour à 560 m³/jour, • introduire une technologie moderne pour le traitement et le contrôle automatisé du traitement des eaux urbaines résiduaires, • accroître l’efficacité du traitement des eaux urbaines résiduaires, • permettre aux nouveaux utilisateurs de se connecter au réseau d’égouts et ainsi réduire la charge et les coûts des fosses septiques, •...
  • curprev 07:3207:32, 2 December 2021DG Regio talk contribs 14,599 bytes +216 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 17:2717:27, 20 October 2020DG Regio talk contribs 14,822 bytes +177 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 17:2717:27, 20 October 2020DG Regio talk contribs 14,645 bytes −180 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 17:2717:27, 20 October 2020DG Regio talk contribs 14,825 bytes +2,884 Created claim: summary (P836): The direct objective of the project is to: • Increase the capacity of waste water treatment plants from 250 m³/day to 560 m³/day, • introduction of modern technology of treatment and automated control of municipal wastewater treatment process, • increase the efficiency of urban waste water treatment, • enabling new customers to connect to the sewage network, and thus reduce the burden and costs of exporting cesspools, • improving working conditi...
  • curprev 17:2717:27, 20 October 2020DG Regio talk contribs 11,941 bytes −2,518 Removed claim: summary (P836): The direct objective of the project is to: • the extension of the capacity of the waste water treatment plant from 250 m³/day to 560 m³/day,• the introduction of modern cleaning and automated waste water treatment,• improving the efficiency of urban waste water treatment,• enabling new customers to be connected to the sewage network and thereby reducing the nuisance and the cost of exporting septic tanks,• improving the working conditions of w...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 11:0611:06, 10 March 2020DG Regio talk contribs 13,169 bytes −2,518 Removed claim: summary (P836): The direct objective of the project is to: • the extension of the capacity of the waste water treatment plant from 250 m³/day to 560 m³/day,• the introduction of modern cleaning and automated waste water treatment,• improving the efficiency of urban waste water treatment,• enabling new customers to be connected to the sewage network and thereby reducing the nuisance and the cost of exporting septic tanks,• improving the working conditions of w...
  • curprev 09:4109:41, 10 March 2020DG Regio talk contribs 15,687 bytes +2,518 Created claim: summary (P836): The direct objective of the project is to: • the extension of the capacity of the waste water treatment plant from 250 m³/day to 560 m³/day,• the introduction of modern cleaning and automated waste water treatment,• improving the efficiency of urban waste water treatment,• enabling new customers to be connected to the sewage network and thereby reducing the nuisance and the cost of exporting septic tanks,• improving the working conditions of wor...
  • curprev 09:3709:37, 10 March 2020DG Regio talk contribs 13,169 bytes +2,518 Created claim: summary (P836): The direct objective of the project is to: • the extension of the capacity of the waste water treatment plant from 250 m³/day to 560 m³/day,• the introduction of modern cleaning and automated waste water treatment,• improving the efficiency of urban waste water treatment,• enabling new customers to be connected to the sewage network and thereby reducing the nuisance and the cost of exporting septic tanks,• improving the working conditions of wor...

24 February 2020

18 February 2020

31 January 2020

14 January 2020