Revision history of "Foot-bike paths with accompanying infrastructure" (Q112942)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 October 2022

2 July 2022

  • curprev 15:4515:45, 2 July 2022DG Regio talk contribs 83,939 bytes +54,130 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0720:07, 1 December 2021DG Regio talk contribs 17,430 bytes +3,105 Created claim: summary (P836): Le projet comprend la construction de 9 installations touristiques et de sentiers pédestres récréatifs autour du réservoir de Dobczycki dans la municipalité de Myślenice. La longueur des sentiers désignés est de 16,88 km. 90 chemins sont délimités sur les voies existantes et les chemins de terre. La largeur des chemins est de 253,0 m en moyenne. Les sentiers sont situés à proximité immédiate des rangées. Raby i Zb. Dobczycki et sont une continua...
  • curprev 20:0720:07, 1 December 2021DG Regio talk contribs 14,325 bytes +114 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 14:3314:33, 20 October 2020DG Regio talk contribs 14,650 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3314:33, 20 October 2020DG Regio talk contribs 14,543 bytes −119 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3314:33, 20 October 2020DG Regio talk contribs 14,662 bytes +2,882 Created claim: summary (P836): The project includes the construction of 9 tourist and recreational footpaths around the Dobczycki Reservoir, in the municipality of Myślenice. The length of the designated paths is 16.88 km. 90 paths are marked on existing roads and dirt roads. The width of the paths is on average 2,53,0 m. The paths are located in the immediate vicinity of the rows. Raby and Zb. Dobczycki is a continuation of the existing cycle path in the recreational town of...
  • curprev 14:3314:33, 20 October 2020DG Regio talk contribs 11,780 bytes −2,309 Removed claim: summary (P836): The project involves the construction of 9 tourist sites and recreational ruff paths around the Dobczycki reservoir in the municipality of Myślenice. The lengths of the defined paths shall be 16.88 km. The 90 pathways are defined by the existing routes and routes. The paths are reached at an average of 2,53.0 m. the paths are located in the immediate vicinity of a government. Ry and ZB. Dobczycki and is a continuation of the existing path for...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1408:14, 10 March 2020DG Regio talk contribs 12,799 bytes +2,309 Created claim: summary (P836): The project involves the construction of 9 tourist sites and recreational ruff paths around the Dobczycki reservoir in the municipality of Myślenice. The lengths of the defined paths shall be 16.88 km. The 90 pathways are defined by the existing routes and routes. The paths are reached at an average of 2,53.0 m. the paths are located in the immediate vicinity of a government. Ry and ZB. Dobczycki and is a continuation of the existing path for a...

24 February 2020

18 February 2020

31 January 2020

14 January 2020