Revision history of "Revitalisation of the historic park near the castle and park complex in the Zatore with the restoration of recreational and utility functions to ensure convenient use of the historical attractions of the Castle and the promotion of tourist advantages of t" (Q112868)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3619:36, 2 March 2023DG Regio talk contribs 88,401 bytes −4,343 Changed label, description and/or aliases in da, it, lv, sk, bg, el, fr, ro, et, sl, ga, pt, fi, cs, sv, es, de, hr, hu, lt, nl, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4315:43, 2 July 2022DG Regio talk contribs 90,617 bytes +59,413 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0020:00, 1 December 2021DG Regio talk contribs 17,889 bytes +2,981 Created claim: summary (P836): L’objet du projet est de recréer le parc ornemental du château et d’utiliser ses atouts naturels et paysagers en créant des infrastructures touristiques et récréatives. Lors de la préparation des hypothèses et de la documentation technique du projet, la formule du concours d’architecture a été utilisée. Les tâches suivantes doivent être exécutées: 1. Parc Górny:wprowadzenie sur la page fr. T. Kościuszki nouveau transport de roues, y compris la c...
  • curprev 20:0020:00, 1 December 2021DG Regio talk contribs 14,908 bytes +351 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 14:2814:28, 20 October 2020DG Regio talk contribs 14,996 bytes +325 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:2814:28, 20 October 2020DG Regio talk contribs 14,671 bytes −313 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:2814:28, 20 October 2020DG Regio talk contribs 14,984 bytes +2,894 Created claim: summary (P836): The object of the project is the restoration of the ornamental park near the castle and the use of its natural and landscape assets through the creation of tourist and recreational infrastructure. In the course of drafting the project assumptions and technical documentation, the architectural competition formula was used. It is assumed to carry out tasks:1. Upper Park:Introduction from the side pl. T. Kościuszki new circular communication, inclu...
  • curprev 14:2814:28, 20 October 2020DG Regio talk contribs 12,090 bytes −2,269 Removed claim: summary (P836): The purpose of the project is to recreate a functional park at the castle and to exploit its natural and landscape amenities by developing tourist and recreational facilities. The design of the design and technical documentation used the design of the architectural competition. The tasks are to be carried out: 1. Upper park: introduction from the side T. Kościuszki of the new taxi service, including the construction of an entry gate including...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1808:18, 10 March 2020DG Regio talk contribs 13,078 bytes +2,269 Created claim: summary (P836): The purpose of the project is to recreate a functional park at the castle and to exploit its natural and landscape amenities by developing tourist and recreational facilities. The design of the design and technical documentation used the design of the architectural competition. The tasks are to be carried out: 1. Upper park: introduction from the side T. Kościuszki of the new taxi service, including the construction of an entry gate including th...

24 February 2020

18 February 2020

31 January 2020

14 January 2020