Revision history of "Extension of the sewage treatment plant in Proszowice" (Q112685)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 80,636 bytes 0 Changed label, description and/or aliases in pt
  • curprev 06:1406:14, 9 October 2024DG Regio talk contribs 80,636 bytes +51 Set a claim value: summary (P836): Os trabalhos previstos permitirão o lançamento da segunda linha de tratamento de águas residuais, o que afetará a possibilidade de assumir mais águas residuais transportadas por navios-tanque e aumentará o controlo sobre as águas residuais entregues. Estão previstas as seguintes obras: instalação do medidor de caudais juntamente com o registador no poço do lavatório, compra de um agitador sobresselente, entrada em funcionamento do segundo fio, o que...

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:3915:39, 2 July 2022DG Regio talk contribs 76,050 bytes +48,679 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5919:59, 1 December 2021DG Regio talk contribs 16,208 bytes +2,746 Created claim: summary (P836): Les travaux prévus permettront le lancement d’un deuxième volet de traitement des eaux résiduaires, ce qui affectera la possibilité de reprendre davantage d’eaux usées fournies par les citernes d’épuration et renforcera le contrôle sur les eaux usées rejetées.Il est prévu de réaliser les travaux suivants: installation d’un débitmètre avec un enregistreur sur le puits d’évier, achat d’un agitateur de rechange, lancement d’un second filetage, ce q...
  • curprev 19:5919:59, 1 December 2021DG Regio talk contribs 13,462 bytes +127 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 13,776 bytes +114 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 13,662 bytes −118 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 13,780 bytes +2,390 Created claim: summary (P836): The planned work will allow the launch of the second sewage treatment thread, which will affect the possibility of taking over more sewage transported by tankers and increase control over the delivered sewage.The following works are planned: installation of the flow meter together with the recorder on the sink well, purchase of a spare stirrer, commissioning the second thread, which entails the purchase of mixers and its cleaning costs, installa...
  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 11,390 bytes −2,071 Removed claim: summary (P836): The planned work will allow the second treatment of the waste water to be put into operation, which will affect the possibility of taking over the higher volumes of waste water from the asepsis, and will increase control over the associated effluent. the installation of a flow meter, including a recorder on the water wells, purchase of a mixer, the initiation of a second thread are associated with the purchase of a trap and the cost of cleanin...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0212:02, 9 March 2020DG Regio talk contribs 12,178 bytes +2,071 Created claim: summary (P836): The planned work will allow the second treatment of the waste water to be put into operation, which will affect the possibility of taking over the higher volumes of waste water from the asepsis, and will increase control over the associated effluent. the installation of a flow meter, including a recorder on the water wells, purchase of a mixer, the initiation of a second thread are associated with the purchase of a trap and the cost of cleaning...

24 February 2020

18 February 2020

31 January 2020

14 January 2020