Revision history of "THE MUNICIPALITY OF KĘTY. Clean air – our common cause. Liquidation of solid fuel heating sources in individual households." (Q112378)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5803:58, 11 October 2024DG Regio talk contribs 90,577 bytes +4 Changed label, description and/or aliases in pt
  • curprev 03:5803:58, 11 October 2024DG Regio talk contribs 90,573 bytes −70 Set a claim value: summary (P836): O projeto destina-se a substituir 110 caldeiras para combustíveis sólidos por novas caldeiras para biomassa 5 e combustíveis gasosos 105. As novas fontes de calor instaladas serão caracterizadas pelo nível mínimo de eficiência energética e pelas normas de emissão estabelecidas nas medidas de execução da Diretiva 2009125CE, de 21 de outubro de 2009, em vigor desde o final de 2020. Para além das tarefas de intercâmbio de calor, estão também previstas...

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 22:3422:34, 2 March 2023DG Regio talk contribs 87,469 bytes +874 Changed label, description and/or aliases in da, it, sk, ga, et, bg, lv, cs, mt, lt, fi, pt, fr, de, ro, el, sv, sl, es, nl, hu, hr, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:3315:33, 2 July 2022DG Regio talk contribs 84,470 bytes +54,507 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 12:1012:10, 1 December 2021DG Regio talk contribs 17,448 bytes +3,129 Created claim: summary (P836): Le projet concerne le remplacement de 110 chaudières à combustibles solides par de nouvelles chaudières à biomasse 5 et 105 combustibles gazeux. Les nouveaux générateurs de chaleur installés seront caractérisés par le niveau minimal d’efficacité énergétique et de normes d’émission de polluants en vigueur depuis la fin de 2020, tels qu’ils sont définis dans les mesures d’exécution de la directive 2009125CE du 21 octobre 2009. Outre les tâches lié...
  • curprev 12:1012:10, 1 December 2021DG Regio talk contribs 14,319 bytes +204 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:0912:09, 20 October 2020DG Regio talk contribs 14,556 bytes +188 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:0912:09, 20 October 2020DG Regio talk contribs 14,368 bytes −190 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:0912:09, 20 October 2020DG Regio talk contribs 14,558 bytes +2,652 Created claim: summary (P836): The project is intended to replace 110 boilers for solid fuels with new boilers for biomass 5 and gaseous fuels 105. The installed new heat sources will be characterised by the minimum level of energy efficiency and emission standards set out in the implementing measures of Directive 2009125EC of 21 October 2009, in force since the end of 2020. In addition to the heat exchange tasks, tasks aimed at raising environmental awareness in particular i...
  • curprev 12:0912:09, 20 October 2020DG Regio talk contribs 11,906 bytes −2,239 Removed claim: summary (P836): The project involves the replacement of 110 solid fuel boilers for new biomass fuel boilers 5 and gaseous fuel 105. The new heat generators installed will have a minimum level of energy efficiency and pollutant emission standards in force since the end of 2020, as defined in the implementing measures of the 2009125EC Directive of 21 October 2009. in addition to tasks related to the replacement of heat sources, tasks are also planned to raise e...

24 September 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:4011:40, 9 March 2020DG Regio talk contribs 12,853 bytes +2,239 Created claim: summary (P836): The project involves the replacement of 110 solid fuel boilers for new biomass fuel boilers 5 and gaseous fuel 105. The new heat generators installed will have a minimum level of energy efficiency and pollutant emission standards in force since the end of 2020, as defined in the implementing measures of the 2009125EC Directive of 21 October 2009. in addition to tasks related to the replacement of heat sources, tasks are also planned to raise env...

24 February 2020

18 February 2020

31 January 2020

14 January 2020