Revision history of "Construction of the city ring road Wyszkowa – stages III and IV" (Q109441)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:2719:27, 2 March 2023DG Regio talk contribs 86,746 bytes +142 Changed label, description and/or aliases in da, it, sk, es, et, de, cs, lt, sv, ga, bg, fi, lv, ro, nl, pt, hr, el, fr, sl, hu, mt, and other parts

25 October 2022

20 October 2022

2 July 2022

  • curprev 14:3114:31, 2 July 2022DG Regio talk contribs 84,939 bytes +54,234 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 10:1210:12, 1 December 2021DG Regio talk contribs 18,446 bytes +3,094 Created claim: summary (P836): Le projet sera mis en œuvre dans la voïvodie de Mazowieckie, dans la sous-région d’Ostrolecki, dans le comté de Wyszków, dans la municipalité de Wyszków, dans la ville de Wyszków, située sur la voie express S8Warsaw-Bialystok, le long de la route 440584 W, directement reliée au S8 (noeud de Turzyn). L’investissement a été enregistré dans le plan de développement local de la ville de Wyszków. La troisième et quatrième étape prévue du périphérique...
  • curprev 10:1210:12, 1 December 2021DG Regio talk contribs 15,352 bytes +132 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:2110:21, 20 October 2020DG Regio talk contribs 15,661 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:2110:21, 20 October 2020DG Regio talk contribs 15,535 bytes −121 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:2110:21, 20 October 2020DG Regio talk contribs 15,656 bytes +2,904 Created claim: summary (P836): The project is planned to be implemented in the Mazowieckie Voivodeship, the Ostręłęcki subregion, in Wyszków County, in the Wyszków commune, in the town of Wyszków, located on the S8Warszawa – Białystok expressway – within the 440584 W road, directly connecting with the S8 (Turzyn junction). The investment was recorded in the Local Plan for Spatial Development of the City of Wyszków. The planned third and fourth stage of the ring road begins in...
  • curprev 10:2110:21, 20 October 2020DG Regio talk contribs 12,752 bytes −2,366 Removed claim: summary (P836): The project to be implemented in Mazowieckie Province, the Ostrołęcki subregion, in the powiat wyszkowskie, in the municipality of Wyszków (Wyszków Wyszków), in the town of Wyszków (Wyszków Wyszków Wyszków), in the town of Wyszków (Wyszków Wyszków), situated at the S8Warszawa — Białystok, on the 440584W road, directly connected to S8 (Tuzzyn interchange). The investment was recorded in the Local Area Management Plan of the Wyszkow City. The dr...

24 September 2020

16 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

9 March 2020

  • curprev 09:5609:56, 9 March 2020DG Regio talk contribs 13,396 bytes +2,366 Created claim: summary (P836): The project to be implemented in Mazowieckie Province, the Ostrołęcki subregion, in the powiat wyszkowskie, in the municipality of Wyszków (Wyszków Wyszków), in the town of Wyszków (Wyszków Wyszków Wyszków), in the town of Wyszków (Wyszków Wyszków), situated at the S8Warszawa — Białystok, on the 440584W road, directly connected to S8 (Tuzzyn interchange). The investment was recorded in the Local Area Management Plan of the Wyszkow City. The draf...

24 February 2020

18 February 2020

31 January 2020

14 January 2020