Revision history of "Reconstruction of water supply infrastructure in Borki Municipality" (Q105620)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 October 2024

  • curprev 03:5003:50, 11 October 2024DG Regio talk contribs 96,147 bytes +1 Changed label, description and/or aliases in pt
  • curprev 03:5003:50, 11 October 2024DG Regio talk contribs 96,146 bytes +4 Set a claim value: summary (P836): O projeto abrange a execução de tarefas relacionadas com o abastecimento correto e não defeituoso de água aos residentes do município de Borki ligados à rede de abastecimento de água. O investimento inclui tarefas relacionadas com a reconstrução, expansão e construção de uma rede de abastecimento de água. Reconstrução de: está tudo bem. 2,3684 km em Borki – Sitno (troca de tubos de emergência PVC O 160 para tubos PE O 160, no troço aprox. 0,725 km e...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:3111:31, 27 July 2022DG Regio talk contribs 90,960 bytes +59,403 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:5809:58, 1 December 2021DG Regio talk contribs 18,036 bytes +3,455 Created claim: summary (P836): Le projet comprend la mise en œuvre de tâches liées à l’approvisionnement en eau correct et sans problème des habitants de la municipalité de Borka raccordés au réseau d’approvisionnement en eau. L’investissement comprend des tâches liées à la reconstruction, à l’extension et à la construction du réseau d’approvisionnement en eau. Reconstruction: sur le tronçon d’env. 2,3684 km à Borki — Sitno (échange de tuyaux d’urgence en PVC O 160 avec tuyau...
  • curprev 09:5809:58, 1 December 2021DG Regio talk contribs 14,581 bytes +153 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:4416:44, 17 October 2020DG Regio talk contribs 14,867 bytes +126 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:4416:44, 17 October 2020DG Regio talk contribs 14,741 bytes −133 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:4416:44, 17 October 2020DG Regio talk contribs 14,874 bytes +3,106 Created claim: summary (P836): The project covers the implementation of tasks related to correct and non-failure supply of water to residents of Borki Municipality connected to the water supply network. The investment includes tasks related to reconstruction, expansion and construction of a water supply network. Reconstruction of: it’s all right. 2.3684 km in Borki – Sitno (exchange of emergency PVC O 160 pipes for PE O 160 pipes, on the section approx. 0.725 km in Krasew Col...
  • curprev 16:4416:44, 17 October 2020DG Regio talk contribs 11,768 bytes −2,695 Removed claim: summary (P836): The project covers the execution of tasks related to the correct and seamless provision of water to the residents of Borka, which are connected to the water supply network. The investment includes tasks relating to the conversion, extension and construction of a water supply network. Reconstruction: over the section ca. 2.3684 km in Borki — Sitno (replacement of the emergency PVC O 160 pipes on EP pipes O 160), over a section ca. 0.725 km in K...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2909:29, 9 March 2020DG Regio talk contribs 13,179 bytes +2,695 Created claim: summary (P836): The project covers the execution of tasks related to the correct and seamless provision of water to the residents of Borka, which are connected to the water supply network. The investment includes tasks relating to the conversion, extension and construction of a water supply network. Reconstruction: over the section ca. 2.3684 km in Borki — Sitno (replacement of the emergency PVC O 160 pipes on EP pipes O 160), over a section ca. 0.725 km in Kra...

24 February 2020

18 February 2020

31 January 2020

14 January 2020