Revision history of "Modernisation combined with reconstruction of water treatment station in Czołna, Śniadówka" (Q105610)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1719:17, 2 March 2023DG Regio talk contribs 81,802 bytes +121 Changed label, description and/or aliases in da, it, sk, bg, fi, pt, cs, ro, de, es, lv, ga, et, fr, sl, el, sv, nl, mt, hu, lt, hr, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 13:0913:09, 2 July 2022DG Regio talk contribs 79,570 bytes +51,230 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:5709:57, 1 December 2021DG Regio talk contribs 16,800 bytes +2,928 Created claim: summary (P836): Le projet consiste en la construction et la modernisation de l’infrastructure technique de base du réseau d’approvisionnement en eau de la municipalité de Baranów. Champ d’application détaillé du projet: 1.Modernisation combinée à la reconstruction de SUW Śniadówka — extension de la station d’approvisionnement en eau consistant en la construction et l’intégration dans le système technologique existant d’un réservoir supplémentaire de rétention d...
  • curprev 09:5709:57, 1 December 2021DG Regio talk contribs 13,872 bytes +167 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 08:5208:52, 20 October 2020DG Regio talk contribs 14,144 bytes +2,573 Created claim: summary (P836): The project consists of the construction and modernisation of the basic technical infrastructure for the water supply system in the municipality of Baranów. Detailed scope of the project: 1.Modernisation combined with the reconstruction of SUW Śniadówka – extension of the water supply station consisting of building and incorporating an additional drinking water retention tank into the existing technological system. As part of the task: a water l...
  • curprev 08:5208:52, 20 October 2020DG Regio talk contribs 11,571 bytes −2,150 Removed claim: summary (P836): The project consists of the construction and upgrading of basic technical infrastructure for the water supply system of the municipality of Baranów. Detailed scope of the project: 1.Modernisation combined with the conversion of the SUW SUW construction station — extension of water supply station to build and integrate into the existing technology system of an additional drinking water storage reservoir. We have received information that as par...

17 October 2020

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2909:29, 9 March 2020DG Regio talk contribs 12,438 bytes +2,150 Created claim: summary (P836): The project consists of the construction and upgrading of basic technical infrastructure for the water supply system of the municipality of Baranów. Detailed scope of the project: 1.Modernisation combined with the conversion of the SUW SUW construction station — extension of water supply station to build and integrate into the existing technology system of an additional drinking water storage reservoir. We have received information that as part...

24 February 2020

18 February 2020

31 January 2020

14 January 2020