Revision history of "Improving energy efficiency, thermo-modernisation, modernisation and overhaul of the public utility facility – the OSP building in Białka" (Q105398)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1615:16, 7 October 2024DG Regio talk contribs 84,650 bytes 0 Changed label, description and/or aliases in pt
  • curprev 15:1615:16, 7 October 2024DG Regio talk contribs 84,650 bytes −64 Set a claim value: summary (P836): O principal objetivo do projeto é melhorar a eficiência energética no edifício OSP em Białka através de tarefas abrangentes de termomodernização. Custos elegíveis resultantes da auditoria energética: isolamento das paredes da fundação, fachada, carpintaria da porta, carpintaria da janela, aquecimento do chão, tecnologia da sala da caldeira da pelota, instalação de aquecimento central. Os custos inelegíveis incluem outras tarefas do projeto: parede e...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1619:16, 2 March 2023DG Regio talk contribs 82,317 bytes +27 Changed label, description and/or aliases in lv, da, it, ro, sk, bg, et, hr, ga, lt, nl, fi, sl, fr, sv, de, es, el, hu, cs, mt, pt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 13:0513:05, 2 July 2022DG Regio talk contribs 80,180 bytes +51,632 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:4309:43, 1 December 2021DG Regio talk contribs 16,776 bytes +2,854 Created claim: summary (P836): L’objectif principal du projet est d’améliorer l’efficacité énergétique dans le bâtiment des GRT à Białka par la mise en œuvre de tâches complexes de thermomodernisation. Coûts éligibles résultant de l’audit énergétique: isolation des murs de fondation, façade, menuiserie de porte, menuiserie de fenêtre, chauffage du plafond grenier, technologie de la chaudière à granulés, installation de l’eau chaude. Les coûts inéligibles comprennent d’autres...
  • curprev 09:4309:43, 1 December 2021DG Regio talk contribs 13,922 bytes +237 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 08:5908:59, 20 October 2020DG Regio talk contribs 14,126 bytes +202 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:5908:59, 20 October 2020DG Regio talk contribs 13,924 bytes −194 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 08:5908:59, 20 October 2020DG Regio talk contribs 14,118 bytes +2,444 Created claim: summary (P836): The main objective of the project is to improve energy efficiency in the OSP building in Białka through comprehensive thermomodernisation tasks. Eligible costs resulting from the energy audit: insulation of the foundation walls, facade, door carpentry, window carpentry, floor warming, pellet boiler room technology, central heating installation. Ineligible costs include other tasks in the project: walling and machining, partition walls, plasterin...
  • curprev 08:5908:59, 20 October 2020DG Regio talk contribs 11,674 bytes −2,071 Removed claim: summary (P836): The main objective of the project is to improve the energy efficiency of the buildings of the TSOs in Białystok by implementing the comprehensive thermal modernisation tasks. Eligible costs resulting from the energy audit: insulation of fundamental walls, façade, door joinery, window frames, insulation of the costume, technology for the boiler plant for pellets, the installation of a c.o. Non-eligible costs include other tasks in the project:...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:1610:16, 6 March 2020DG Regio talk contribs 12,454 bytes +2,071 Created claim: summary (P836): The main objective of the project is to improve the energy efficiency of the buildings of the TSOs in Białystok by implementing the comprehensive thermal modernisation tasks. Eligible costs resulting from the energy audit: insulation of fundamental walls, façade, door joinery, window frames, insulation of the costume, technology for the boiler plant for pellets, the installation of a c.o. Non-eligible costs include other tasks in the project: co...

24 February 2020

18 February 2020

31 January 2020

14 January 2020