Revision history of "Thermal upgrading of public utility facilities in the Non-Door Large Town" (Q105378)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1515:15, 7 October 2024DG Regio talk contribs 82,603 bytes +21 Changed label, description and/or aliases in pt
  • curprev 15:1515:15, 7 October 2024DG Regio talk contribs 82,582 bytes −29 Set a claim value: summary (P836): O projeto diz respeito à modernização térmica dos edifícios do Gabinete Municipal, do Centro de Assistência Social e da USC. Criação da UEM: Moderno. sistema de aquecimento central, substituindo a caldeira a gás com melhor eficiência, condensação. Isolamento de paredes exteriores, aquecimento do tecto sobre o sótão, substituição de janelas, substituição de portas exteriores instalação de colectores solares, painéis fotovoltaicos, iluminação LED e ec...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1619:16, 2 March 2023DG Regio talk contribs 80,214 bytes +570 Changed label, description and/or aliases in it, sk, lv, da, ga, fi, sl, et, ro, hr, cs, el, sv, fr, lt, pt, hu, nl, es, de, bg, mt, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 13:0413:04, 2 July 2022DG Regio talk contribs 77,528 bytes +49,939 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:3609:36, 1 December 2021DG Regio talk contribs 16,411 bytes +2,805 Created claim: summary (P836): Le projet concerne la thermomodernisation des bâtiments du bureau municipal, du centre de protection sociale et de l’USC. Bâtiment UG: Moderne. système de chauffage central, remplacement de la chaudière à gaz par chaudière avec un meilleur rendement, condensation. Isolation des murs extérieurs, isolation du plafond au-dessus du grenier, remplacement des fenêtres, remplacement des portes extérieures installation de capteurs solaires, panneaux pho...
  • curprev 09:3609:36, 1 December 2021DG Regio talk contribs 13,606 bytes +134 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 08:5908:59, 20 October 2020DG Regio talk contribs 13,913 bytes +134 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 08:5908:59, 20 October 2020DG Regio talk contribs 13,779 bytes −135 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 08:5908:59, 20 October 2020DG Regio talk contribs 13,914 bytes +2,471 Created claim: summary (P836): The project concerns the thermal modernisation of buildings of the Municipal Office, the Social Welfare Centre and the USC. EMU building: Modern. central heating system, replacing the gas boiler with better efficiency, condensation. Insulation of external walls, warming of the ceiling over the attic, replacement of windows, replacement of external doors installation of solar collectors, photovoltaic panels, LED lighting and screens behind radiat...
  • curprev 08:5908:59, 20 October 2020DG Regio talk contribs 11,443 bytes −1,983 Removed claim: summary (P836): The project concerns the thermal renovation of the Authority’s buildings, the Social Assistance Centre and the USC. UG Building: Modernising central heating system, replacement of a boiler with a better efficiency, condensing boiler. Insulation of the outer walls, insulation of the ceiling floor, replacement of windows, replacement of external doors for solar collectors, photovoltaic panels, LED lighting and screens for radiators. USC Building...

23 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:1510:15, 6 March 2020DG Regio talk contribs 12,146 bytes +1,983 Created claim: summary (P836): The project concerns the thermal renovation of the Authority’s buildings, the Social Assistance Centre and the USC. UG Building: Modernising central heating system, replacement of a boiler with a better efficiency, condensing boiler. Insulation of the outer walls, insulation of the ceiling floor, replacement of windows, replacement of external doors for solar collectors, photovoltaic panels, LED lighting and screens for radiators. USC Building:...

24 February 2020

18 February 2020

31 January 2020

14 January 2020