Revision history of "Construction of 26 kW photovoltaic installation in the inn “Sosnowe Uroczysko” in Firlej" (Q104831)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 October 2024

  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 66,105 bytes −32 Changed label, description and/or aliases in pt
  • curprev 15:1115:11, 7 October 2024DG Regio talk contribs 66,137 bytes −24 Set a claim value: summary (P836): O projeto consistirá na instalação de uma instalação fotovoltaica com uma capacidade de 26 kW na estalagem «Sosnowe Uroczysko» em Firlej (21-136 Firlej, Serocka 35, lote n.o 458/3). O objetivo do projeto é melhorar a competitividade da empresa através da redução dos custos da eletricidade. Atualmente, o edifício da estalagem não tem fonte própria de eletricidade e toda a procura é coberta pela rede pela PGE Obrót S.A. O consumo de eletricidade em 20...

22 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:1519:15, 2 March 2023DG Regio talk contribs 63,764 bytes +334 Changed label, description and/or aliases in sk, da, it, lv, fi, fr, et, ro, sv, ga, es, pt, de, hu, bg, hr, lt, el, sl, cs, nl, mt, and other parts

27 October 2022

26 October 2022

21 October 2022

27 July 2022

  • curprev 11:2411:24, 27 July 2022DG Regio talk contribs 61,316 bytes +38,186 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 14,666 bytes +2,073 Created claim: summary (P836): Le projet consistera en l’installation d’une installation photovoltaïque de 26 kW dans le bâtiment de l’auberge «SOSNOWE Uroczysko» à Firlej (21-136 Firlej, Serocka 35, parcelle no 458/3). L’objectif du projet est d’améliorer la compétitivité de l’entreprise en réduisant les coûts de l’électricité. À l’heure actuelle, le bâtiment de l’auberge ne dispose pas de sa propre source d’électricité et la totalité de la demande est couverte par le réseau...
  • curprev 09:1309:13, 1 December 2021DG Regio talk contribs 12,593 bytes +184 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 12,848 bytes +151 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 12,697 bytes −158 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 12,855 bytes +1,940 Created claim: summary (P836): The project will consist of the installation of a photovoltaic installation with a capacity of 26 kW in the inn “Sosnowe Uroczysko” in Firlej (21-136 Firlej, Serocka 35, plot number 458/3). The aim of the project is to improve the company’s competitiveness by reducing the costs of electricity. At present, the inn building does not have its own source of electricity and all demand is covered by the network by PGE Obrót S.A. The electricity consum...
  • curprev 16:5816:58, 17 October 2020DG Regio talk contribs 10,915 bytes −1,507 Removed claim: summary (P836): The project will consist of the installation of a 26 kW photovoltaic installation in the ‘Sowarp Uroczysko’ building in Firleju (21-136 Firleu, Serock 35, parcel number 458/3). The purpose of the project is to improve the competitiveness of the company by reducing the cost of electricity. At present, the meeting does not have its own source of electricity and the entire demand is covered from the network by PGE Obacka S.A. The consumption of e...

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:2709:27, 9 March 2020DG Regio talk contribs 11,131 bytes +1,507 Created claim: summary (P836): The project will consist of the installation of a 26 kW photovoltaic installation in the ‘Sowarp Uroczysko’ building in Firleju (21-136 Firleu, Serock 35, parcel number 458/3). The purpose of the project is to improve the competitiveness of the company by reducing the cost of electricity. At present, the meeting does not have its own source of electricity and the entire demand is covered from the network by PGE Obacka S.A. The consumption of ele...

24 February 2020

18 February 2020

31 January 2020

14 January 2020