Revision history of "EXTENSION OF VOIVODESHIP ROAD NO. 715 – UL. BRZEZIŃSKA IN KOLUSZKI" (Q101700)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 95,867 bytes +2 Changed label, description and/or aliases in pt
  • curprev 18:1118:11, 8 October 2024DG Regio talk contribs 95,865 bytes −9 Set a claim value: summary (P836): A execução do projeto resulta da necessidade de aumentar a acessibilidade dos transportes da voivodia de Lodz no tráfego rodoviário. O objetivo do investimento é: melhorar as condições técnicas, a capacidade e a segurança do tráfego rodoviário (trânsito e local) e dos peões, adaptar a capacidade de carga da estrada aos requisitos da legislação em vigor e melhorar as condições ambientais. A implementação do investimento servirá tanto os residentes qu...

23 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0719:07, 2 March 2023DG Regio talk contribs 91,979 bytes +438 Changed label, description and/or aliases in lv, it, da, sk, el, bg, cs, et, fr, ro, ga, pt, hu, sv, fi, hr, lt, sl, es, nl, mt, de, and other parts

19 October 2022

2 July 2022

  • curprev 11:5011:50, 2 July 2022DG Regio talk contribs 90,363 bytes +58,421 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

3 December 2021

1 December 2021

  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 19,620 bytes +3,305 Created claim: summary (P836): La mise en œuvre du projet est due à la nécessité d’accroître l’accessibilité des transports de la voïvodie de Łódź dans la circulation routière. L’objectif de l’investissement est de: améliorer les conditions techniques, la capacité et la sécurité du trafic routier (transit et local) et des piétons, adapter la capacité de charge de la route aux exigences de la réglementation en vigueur et améliorer les conditions environnementales. L’investisse...
  • curprev 08:2808:28, 1 December 2021DG Regio talk contribs 16,315 bytes +133 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 16,621 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 16,493 bytes −128 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 16,621 bytes +2,956 Created claim: summary (P836): Implementation of the project results from the need to increase transport accessibility of the Łódź Voivodeship in road traffic. The purpose of the investment is to: improve the technical conditions, capacity and safety of road traffic (transit and local) and pedestrians, adapt the load capacity of the road to the requirements of existing legislation and improve environmental conditions. The implementation of the investment will serve both resid...
  • curprev 15:1315:13, 17 October 2020DG Regio talk contribs 13,665 bytes −2,502 Removed claim: summary (P836): The implementation of the project results from the need to increase the transport accessibility of the Łódzkie region in road traffic. The purpose of the investment is to: improving the technical conditions, capacity and safety of traffic (transit and local) and walking, adapting the load capacity to the requirements of the applicable rules and improving ecological conditions. Investments will be made both for residents who use it for professi...

23 September 2020

17 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 09:1109:11, 9 March 2020DG Regio talk contribs 14,031 bytes +2,502 Created claim: summary (P836): The implementation of the project results from the need to increase the transport accessibility of the Łódzkie region in road traffic. The purpose of the investment is to: improving the technical conditions, capacity and safety of traffic (transit and local) and walking, adapting the load capacity to the requirements of the applicable rules and improving ecological conditions. Investments will be made both for residents who use it for profession...

24 February 2020

18 February 2020

31 January 2020

14 January 2020