Revision history of "Reconstruction and expansion of Voivodeship No. 137 of the Słubice – Sulęcin – Międzyrzecz relations" (Q100455)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

9 October 2024

  • curprev 06:0906:09, 9 October 2024DG Regio talk contribs 91,275 bytes +16 Changed label, description and/or aliases in pt
  • curprev 06:0906:09, 9 October 2024DG Regio talk contribs 91,259 bytes −30 Set a claim value: summary (P836): O projeto envolve a reconstrução e a extensão de 4 troços do DW 137 numa extensão de 5,61 km e visa melhorar as características funcionais, funcionais e de segurança. Prevê-se: reconstrução e ampliação de estradas, reconstrução/expansão de declives, construção/reconstrução de valas rodoviárias, renovação de pontes, modificação de pontões, bermas de estradas, melhoria dos elementos de marcação, instalação de barreiras de proteção, segurança e reconst...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 21:3121:31, 2 March 2023DG Regio talk contribs 88,532 bytes +79 Changed label, description and/or aliases in it, da, sk, fi, lv, hr, sv, el, ga, lt, ro, bg, hu, de, et, cs, pt, sl, nl, mt, es, and other parts

21 October 2022

2 July 2022

  • curprev 11:2311:23, 2 July 2022DG Regio talk contribs 87,639 bytes +56,090 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 18,647 bytes +3,218 Created claim: summary (P836): Le projet comprend la reconstruction et l’extension de 4 tronçons de DW 137 sur une longueur de 5,61 km et vise à améliorer les performances fonctionnelles, opérationnelles et de sécurité. Il est prévu de: reconstruction et extension des routes existantes, reconstruction/extension des sorties, construction/reconstruction de fossés routiers, réparation des ponts, reconstruction de ponceaux, latéral, amélioration des éléments de signalisation, ins...
  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 15,429 bytes +147 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 08:5108:51, 20 October 2020DG Regio talk contribs 15,721 bytes +2,862 Created claim: summary (P836): The project involves the reconstruction and extension of 4 sections of DW 137 over a length of 5.61 km and aims to improve functional, functional and safety features. It is planned to: reconstruction and expansion of roadways, reconstruction/expansion of downhills, construction/reconstruction of road ditches, bridge renovation, modification of culverts, roadsides, improvement of marking elements, installation of protective barriers, security and...
  • curprev 08:5108:51, 20 October 2020DG Regio talk contribs 12,859 bytes −2,373 Removed claim: summary (P836): The project consists of the upgrading and extension of 4 sections of 137 km of 5.61 km in length and aims to improve functional, performance and security features. The plans are to: reconstruction and upgrading of roads, upgrading/upgrading of roads, construction/reconstruction of road ditches, bridge renovation, vehicle reconstruction, verges, improvement of marking elements, fitting of protective barriers, security and reconstruction of the...

17 October 2020

23 September 2020

16 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:0410:04, 6 March 2020DG Regio talk contribs 13,502 bytes +2,373 Created claim: summary (P836): The project consists of the upgrading and extension of 4 sections of 137 km of 5.61 km in length and aims to improve functional, performance and security features. The plans are to: reconstruction and upgrading of roads, upgrading/upgrading of roads, construction/reconstruction of road ditches, bridge renovation, vehicle reconstruction, verges, improvement of marking elements, fitting of protective barriers, security and reconstruction of the el...

24 February 2020

18 February 2020

31 January 2020

14 January 2020