Revision history of "Reconstruction and extension of Voivodeship No. 278 to pc. Sulechów – Konotop" (Q100449)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:0918:09, 8 October 2024DG Regio talk contribs 96,328 bytes −18 Changed label, description and/or aliases in pt
  • curprev 18:0918:09, 8 October 2024DG Regio talk contribs 96,346 bytes −271 Set a claim value: summary (P836): O projeto inclui a reconstrução e expansão do DW 278 em duas secções com um comprimento total. 6,62 km e visa melhorar os recursos funcionais, funcionais e de segurança. Os planos de investimento incluem a expansão e construção de saídas individuais, extensão de saídas públicas, baías de autocarros, construção de intersecção com a estrada comum, reconstrução/construção de valas juntamente com valas cobertas, reconstrução de valas existentes, instala...

7 March 2024

15 January 2024

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0319:03, 2 March 2023DG Regio talk contribs 93,137 bytes +5,145 Changed label, description and/or aliases in fr, it, lv, ro, da, el, fi, sk, es, et, sv, cs, pt, sl, ga, lt, hu, hr, mt, de, bg, nl, and other parts

21 October 2022

27 July 2022

  • curprev 10:4410:44, 27 July 2022DG Regio talk contribs 86,819 bytes +54,286 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

3 December 2021

1 December 2021

  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 20,285 bytes +3,261 Created claim: summary (P836): Le projet comprend la reconstruction et l’extension de DW 278 en deux sections d’une longueur totale. 6,62 km et vise à améliorer les conditions de fonctionnement, de performance et de sécurité. Dans le cadre de l’investissement, il est prévu d’agrandir et de construire des sorties individuelles, l’extension des sorties publiques, des baies d’autobus, la construction d’un carrefour avec la route municipale, la reconstruction/construction de foss...
  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 17,024 bytes +146 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 14:3614:36, 17 October 2020DG Regio talk contribs 17,317 bytes +139 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3614:36, 17 October 2020DG Regio talk contribs 17,178 bytes −143 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3614:36, 17 October 2020DG Regio talk contribs 17,321 bytes +2,697 Created claim: summary (P836): The project includes the reconstruction and expansion of DW 278 on two sections with a total length. 6.62 km and aims to improve functional, functional and safety features. The investment plans include expansion and construction of individual exits, extension of public exits, bus bays, construction of intersection with communal road, reconstruction/construction of ditches along with covered ditches, reconstruction of existing culverts, installat...
  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 14,624 bytes −2,405 Removed claim: summary (P836): The project consists of the reconstruction and extension of the DW 278 on two sections with a total length of time. 6.62 km and aims to improve functional, performance and security characteristics. The investment plans, among other things, plans to expand and build up individual roads, to extend public holidays and bus bays, to construct a crossroads with the municipal road, to rebuild/build roadside ditches with the ditches over the reconstru...

23 September 2020

16 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:0410:04, 6 March 2020DG Regio talk contribs 14,486 bytes +2,405 Created claim: summary (P836): The project consists of the reconstruction and extension of the DW 278 on two sections with a total length of time. 6.62 km and aims to improve functional, performance and security characteristics. The investment plans, among other things, plans to expand and build up individual roads, to extend public holidays and bus bays, to construct a crossroads with the municipal road, to rebuild/build roadside ditches with the ditches over the reconstruct...

24 February 2020

18 February 2020

31 January 2020

14 January 2020