Revision history of "Construction of the bridge over the Oder River with the construction of a new route of the Voivodeship Road No. 282 – Stage II" (Q100444)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:0918:09, 8 October 2024DG Regio talk contribs 94,403 bytes −11 Changed label, description and/or aliases in pt
  • curprev 18:0918:09, 8 October 2024DG Regio talk contribs 94,414 bytes −25 Set a claim value: summary (P836): O projeto consiste na construção de uma ponte sobre o rio Oder (cerca de 380 m), juntamente com a construção da estrada n.o 282 do Voivodato, após uma nova via com um comprimento total de cerca de 9,2 km entre Łaz e Bojadła, bem como na reconstrução da DW 282 existente no local de incorporação e intersecção com a estrada recém-construída. O objetivo do investimento é garantir uma viagem eficiente, segura, durante todo o ano e ecológica através do DW...

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:0319:03, 2 March 2023DG Regio talk contribs 92,822 bytes +879 Changed label, description and/or aliases in it, da, lv, sk, et, ro, fi, hu, sv, cs, de, pt, fr, hr, bg, el, lt, es, nl, ga, mt, sl, and other parts

21 October 2022

27 July 2022

  • curprev 10:4310:43, 27 July 2022DG Regio talk contribs 91,127 bytes +58,209 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

3 December 2021

1 December 2021

  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 19,959 bytes +3,424 Created claim: summary (P836): Le projet consiste en la construction d’un pont au-dessus de la rivière Odra (env. 380 m) avec la construction de la route provinciale no 282 après une nouvelle trace d’une longueur totale d’env. 9,2 km de Łaz à Bojadła, ainsi que la reconstruction du DW 282 existant au lieu d’incorporation et d’intersection avec la route nouvellement construite. L’objectif de l’investissement est d’assurer un passage en douceur, sûr, tout au long de l’année et...
  • curprev 08:4308:43, 1 December 2021DG Regio talk contribs 16,535 bytes +182 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 16,792 bytes +188 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 16,604 bytes −182 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 16,786 bytes +2,986 Created claim: summary (P836): The project consists of building a bridge over the Oder River (ca. 380 m) together with the construction of Voivodeship Road No. 282 after a new track with a total length of approx. 9.2 km from Łaz to Bojadła, as well as reconstruction of the existing DW 282 in the place of incorporation and intersection with the newly built road. The purpose of the investment is to ensure an efficient, safe, year-round and environmentally friendly journey throu...
  • curprev 14:3514:35, 17 October 2020DG Regio talk contribs 13,800 bytes −2,699 Removed claim: summary (P836): The project involves the construction of a bridge over the River Oder (responsible for the bridge. 380 m) with the construction of provincial road No 282 following a new footprint of approximately the total length of ca. 9.2 km from M. Elbe to M. Bojadła, as well as to the upgrading of the existing DW 282 at the point of inclusion and to the intersection with the newly built path. The purpose of the investment is to ensure a smooth, safe, all-...

23 September 2020

16 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:0310:03, 6 March 2020DG Regio talk contribs 14,368 bytes +2,699 Created claim: summary (P836): The project involves the construction of a bridge over the River Oder (responsible for the bridge. 380 m) with the construction of provincial road No 282 following a new footprint of approximately the total length of ca. 9.2 km from M. Elbe to M. Bojadła, as well as to the upgrading of the existing DW 282 at the point of inclusion and to the intersection with the newly built path. The purpose of the investment is to ensure a smooth, safe, all-ye...

24 February 2020

18 February 2020

31 January 2020

14 January 2020