Revision history of "“Termomodernisation of the school building in Gościeszowice, dz. 612/1, the district of Gościeszowice Gm. Niegosławice”" (Q100322)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

8 October 2024

  • curprev 18:0918:09, 8 October 2024DG Regio talk contribs 54,499 bytes +7 Changed label, description and/or aliases in pt
  • curprev 18:0918:09, 8 October 2024DG Regio talk contribs 54,492 bytes −190 Set a claim value: summary (P836): O objetivo do projeto será realizar a modernização térmica do edifício da Escola Primária em Gościeszowice, Dz. N.o 612/1, Gm. Niegosławice, que consiste no aquecimento das paredes exteriores do edifício (875 487 m2), no aquecimento das paredes dos painéis (131 670 m2), no aquecimento do teto (625 636 m2), na construção de uma nova instalação de raios (1 m2), na construção de um novo revestimento de telhado (626 636 m2), na instalação de novas insta...

23 March 2024

15 January 2024

12 June 2023

24 May 2023

2 March 2023

  • curprev 18:5618:56, 2 March 2023DG Regio talk contribs 51,924 bytes +3,330 Changed label, description and/or aliases in da, it, hr, sk, fi, et, ro, lv, sv, pt, el, es, nl, ga, cs, sl, lt, fr, hu, mt, bg, de, and other parts

21 October 2022

27 July 2022

  • curprev 10:4210:42, 27 July 2022DG Regio talk contribs 47,784 bytes +26,920 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:3408:34, 1 December 2021DG Regio talk contribs 13,995 bytes +1,589 Created claim: summary (P836): L’objet du projet sera l’exécution de la modernisation thermique du bâtiment de l’école primaire à Gościszowice, jonction no 612/1, Niegosławice, consistant à chauffer les murs extérieurs du bâtiment (875,487 m²), réchauffer les murs du socle (131,670 m²), réchauffer la stropodache (625,636 m²), faire un nouveau système de foudre (1kpl.), la construction d’un nouveau revêtement de pâte de stropodache (626,636 m²), l’installation d’une nouvelle t...
  • curprev 08:3408:34, 1 December 2021DG Regio talk contribs 12,406 bytes +176 Changed label, description and/or aliases in fr: translated_label

29 October 2020

16 October 2020

  • curprev 00:4000:40, 16 October 2020DG Regio talk contribs 12,669 bytes +186 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 00:4000:40, 16 October 2020DG Regio talk contribs 12,483 bytes −168 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 00:4000:40, 16 October 2020DG Regio talk contribs 12,651 bytes +1,290 Created claim: summary (P836): The object of the project will be to perform thermal modernisation of the building of the Primary School in Gościeszowice, Dz. No 612/1, Gm. Niegosławice, consisting of warming the outer walls of the building (875.487 m²), warming of the panel walls (131.670 m²), warming of the ceiling (625,636 m²), the construction of a new lightning installation (1 sqm), the construction of a new roof covering (626,636 m²), the installation of new metalworks (...
  • curprev 00:4000:40, 16 October 2020DG Regio talk contribs 11,361 bytes −1,084 Removed claim: summary (P836): The project will implement the thermal modernisation of the Primary School building in Goświnice, which is no. no 612/1, i. e), a warming up of the walls of the building (875.487 m²), a warming up of the walls of the building (131.670 m²), a warming up of the walls of the building (1 m²), a warming up of the roof wall (625.636 m²), the construction of a new overhead fine tuning (626.636 m²), the fitting of a new blacksmith (27.63 m²), gutterin...

23 September 2020

16 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 10:0110:01, 6 March 2020DG Regio talk contribs 10,731 bytes +1,084 Created claim: summary (P836): The project will implement the thermal modernisation of the Primary School building in Goświnice, which is no. no 612/1, i. e), a warming up of the walls of the building (875.487 m²), a warming up of the walls of the building (131.670 m²), a warming up of the walls of the building (1 m²), a warming up of the roof wall (625.636 m²), the construction of a new overhead fine tuning (626.636 m²), the fitting of a new blacksmith (27.63 m²), guttering...

24 February 2020

18 February 2020

31 January 2020

14 January 2020