Revision history of "New Research and Development Center T-CZ, a.s." (Q9637)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

23 March 2024

15 January 2024

11 June 2023

17 February 2023

26 July 2022

  • curprev 09:0409:04, 26 July 2022DG Regio talk contribs 49,047 bytes +28,469 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

12 December 2021

2 December 2021

  • curprev 07:4407:44, 2 December 2021DG Regio talk contribs 16,062 bytes +1,398 Created claim: summary (P836): Ziel ist es, die Kapazitäten zu erhöhen und die Forschungsmöglichkeiten unseres F & E-Bereichs zu erweitern, damit wir neue Entwicklungsherausforderungen aufgrund der Nachfrage nach unseren neuen Produkten effektiv bewältigen können. Alle Abteilungen des neuen F & E-Zentrums werden im gemeinsamen Bereich des neuen Gebäudes angesiedelt sein. Das neue F & E-Zentrum wird einen Raum für Entwicklungsarbeitsplätze, Prüf- und Messlabors sowie einen Rau...
  • curprev 07:4407:44, 2 December 2021DG Regio talk contribs 14,664 bytes +111 Changed label, description and/or aliases in de: translated_label

29 November 2021

28 November 2021

  • curprev 07:2807:28, 28 November 2021DG Regio talk contribs 14,469 bytes +1,469 Created claim: summary (P836): L’objectif est d’accroître les capacités et d’élargir les possibilités de recherche dans notre domaine de R & D afin que nous puissions relever efficacement les nouveaux défis de développement en fonction de la demande de nos nouveaux produits. Tous les départements du nouveau centre de R & D seront situés dans l’espace commun du nouveau bâtiment. Le nouveau centre de R-D comprendra un espace pour les lieux de travail de développement, des labor...
  • curprev 07:2707:27, 28 November 2021DG Regio talk contribs 13,000 bytes +115 Changed label, description and/or aliases in fr: translated_label

28 October 2020

22 October 2020

  • curprev 14:5214:52, 22 October 2020DG Regio talk contribs 13,331 bytes +1,346 Created claim: summary (P836): The aim is to increase the capacity and increase the research opportunities of our R & D area so that we can effectively address new development challenges based on demand for our new products. All departments of the new R & D centre will be located in a common area in a new building. The new R & D centre will include space for development workplaces, testing and measurement laboratories, and space for development technologies. As part of the pr...
  • curprev 14:5214:52, 22 October 2020DG Regio talk contribs 11,985 bytes −898 Removed claim: summary (P836): The aim is to increase the capacity and increase the research opportunities of our R & D area so that we can effectively address new development challenges based on demand for our new products. All departments of the new R & D centre will be located in a common area in a new building. The new R & D centre will include space for development workplaces, testing and measurement laboratories, and space for development technologies. As part of the...
  • curprev 06:3106:31, 22 October 2020DG Regio talk contribs 12,883 bytes +105 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 06:3106:31, 22 October 2020DG Regio talk contribs 12,778 bytes −105 Changed label, description and/or aliases in 1 language: remove_english_label

2 September 2020

  • curprev 07:2107:21, 2 September 2020DG Regio talk contribs 12,883 bytes +898 Created claim: summary (P836): The aim is to increase the capacity and increase the research opportunities of our R & D area so that we can effectively address new development challenges based on demand for our new products. All departments of the new R & D centre will be located in a common area in a new building. The new R & D centre will include space for development workplaces, testing and measurement laboratories, and space for development technologies. As part of the pr...

15 July 2020

6 June 2020

25 March 2020

19 March 2020

3 March 2020

11 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)