Revision history of "Hermanowice Strachocin gas pipeline" (Q86102)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

10 June 2023

24 May 2023

2 March 2023

24 October 2022

26 July 2022

  • curprev 04:2504:25, 26 July 2022DG Regio talk contribs 56,288 bytes +31,577 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:2521:25, 30 November 2021DG Regio talk contribs 19,840 bytes +1,711 Created claim: summary (P836): Le projet concerne la construction du gazoduc Hermanowice-Strachocina. Le projet est situé dans les municipalités de Sanok, Tyrawa Wołoska, Dydnia, Bircza, Fredropol, Przemyśl, Ustrzyki Dolne appartenant à la voïvodie de Podkarpackie. Le projet prévoit la mise en œuvre des projets suivants: construction du gazoduc Hermanowice — Strachocina avec les paramètres suivants: diamètre nominal: 700 mm, pression robocze:8,4 MPa, longueur du pipeline: L=...
  • curprev 21:2521:25, 30 November 2021DG Regio talk contribs 18,129 bytes +90 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 18,479 bytes +94 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 18,385 bytes −95 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 18,480 bytes +1,629 Created claim: summary (P836): The subject of the project is the construction of the Hermanowice-Strachocina gas pipeline. The project is located in the communes of Sanok, Tyrawa Wołoska, Dydnia, Bircza, Fredropol, Przemyśl, Ustrzyki Dolne belonging to Podkarpackie Voivodeship. The project envisages the implementation of the following projects: construction of the Hermanowice – Strachocina pipeline with the following parameters: nominal diameter: 700 mm, working pressure: 8,4...
  • curprev 15:3215:32, 14 October 2020DG Regio talk contribs 16,851 bytes −1,228 Removed claim: summary (P836): The project involves the construction of the gas pipeline Hermanowice-Strachocina.The project is located in the municipalities of Sanok, Tyrawa Wołoska, Dona, Bircza, Fredropol, Przemyśl, Lower Silesia (Podkarpackie Province).The project envisages the following projects:construction of the Hermanowice — Strachocina pipeline with the following parameters:nominal diameter:700 mm, pressure robocze:8,4 MPa, pipeline length:L = 71.7 km, as well as:...

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:1810:18, 4 March 2020DG Regio talk contribs 13,881 bytes +1,228 Created claim: summary (P836): The project involves the construction of the gas pipeline Hermanowice-Strachocina.The project is located in the municipalities of Sanok, Tyrawa Wołoska, Dona, Bircza, Fredropol, Przemyśl, Lower Silesia (Podkarpackie Province).The project envisages the following projects:construction of the Hermanowice — Strachocina pipeline with the following parameters:nominal diameter:700 mm, pressure robocze:8,4 MPa, pipeline length:L = 71.7 km, as well as:th...

18 February 2020

8 February 2020

31 January 2020

14 January 2020