Revision history of "Revitalisation and reconstruction of partially closed railway line No. 182 Tarnowskie Góry – Zawiercie" (Q86031)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)

23 March 2024

15 January 2024

13 December 2023

28 June 2023

10 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 22:1622:16, 2 March 2023DG Regio talk contribs 49,012 bytes +48 Changed label, description and/or aliases in da, it, sk, fi, cs, el, fr, sv, et, de, bg, es, ga, lv, lt, pt, nl, hu, ro, hr, sl, mt, and other parts

24 October 2022

27 September 2022

13 August 2022

  • curprev 17:2717:27, 13 August 2022DG Regio talk contribs 48,171 bytes +26,996 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

8 February 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 15,311 bytes +1,300 Created claim: summary (P836): Le projet est situé dans la voïvodie de Silésie et se compose de: * modernisation (y compris électrification) de la ligne de chemin de fer no 182, sur le tronçon Tarnowskie Góry — Zawiercie; * modernisation (y compris électrification) de la liaison no 705 Zawiercie R 125 — Zawiercie R 97; * construction (y compris électrification) de la liaison Miasteczko Śląskie — Gosek. La longueur totale des lignes de chemin de fer couvertes par le projet est...
  • curprev 21:2221:22, 30 November 2021DG Regio talk contribs 14,011 bytes +176 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 14,275 bytes +165 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 14,110 bytes −164 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 14,274 bytes +1,257 Created claim: summary (P836): The project is located in the Silesian Voivodeship and consists of: * modernisation (including electrification) of railway line No. 182, on the Tarnowskie Góry – Zawiercie section; * modernisation (including electrification) of link No. 705 Zawiercie R 125 – Zawiercie R 97; * the construction (including electrification) of the town of Śląskie – Gosek. The total length of the railway lines covered by the project is 48.465 km., translated_summary
  • curprev 15:1415:14, 14 October 2020DG Regio talk contribs 13,017 bytes −777 Removed claim: summary (P836): The project is located in Silesia Province and consists of:* modernisation (including electrification) of railway line No 182, section Tarnowskie Góry — Zawiercie;* upgrade (with electrification) of link No 705 of Zawiercie R 125 — Zawiercie R 97;* Construction (including electrification) of the Miasteczko Śląskie, Gosek.The total length of the railway lines covered by the project is 48.465 km., remove_old_english_translation

23 September 2020

15 July 2020

22 June 2020

16 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 10:0810:08, 4 March 2020DG Regio talk contribs 10,209 bytes +777 Created claim: summary (P836): The project is located in Silesia Province and consists of:* modernisation (including electrification) of railway line No 182, section Tarnowskie Góry — Zawiercie;* upgrade (with electrification) of link No 705 of Zawiercie R 125 — Zawiercie R 97;* Construction (including electrification) of the Miasteczko Śląskie, Gosek.The total length of the railway lines covered by the project is 48.465 km., Adding English summary

18 February 2020

8 February 2020

31 January 2020

(newest | oldest) View (newer 50 | ) (20 | 50 | 100 | 250 | 500)