Revision history of "Construction of the S7 expressway Gdańsk – Elbląg, pc. Thorns – Elbląg" (Q85839)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 22:4022:40, 2 March 2023DG Regio talk contribs 62,134 bytes −389 Changed label, description and/or aliases in it, da, sk, es, lv, ga, fi, el, de, fr, cs, bg, et, sv, sl, lt, pt, ro, nl, hr, hu, mt, and other parts

22 October 2022

26 July 2022

  • curprev 04:1604:16, 26 July 2022DG Regio talk contribs 60,991 bytes +35,350 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

1 June 2022

19 January 2022

15 January 2022

16 December 2021

7 December 2021

3 December 2021

30 November 2021

  • curprev 21:0121:01, 30 November 2021DG Regio talk contribs 18,622 bytes +1,850 Created claim: summary (P836): La partie principale du projet est la construction de l’autoroute S7 sur le tronçon Koszwały — Elbląg d’une longueur totale de 39,63 km, entièrement située dans le réseau central du RTE-T. L’investissement comprend deux tâches: • Tâche 1: Koszwały — Nowy Dwór Gdański, • Tâche 2: Nowy Dwór Gdański — Kazimierzowo. Le début de cet investissement se situe au bout de la route de Gdańsk, au km 17+ 482,61. L’itinéraire a été en partie conçu après une n...
  • curprev 21:0121:01, 30 November 2021DG Regio talk contribs 16,772 bytes +140 Changed label, description and/or aliases in fr: translated_label

29 October 2020

14 October 2020

  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 17,072 bytes +136 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 16,936 bytes −147 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 17,083 bytes +1,760 Created claim: summary (P836): The main part of the project is the construction of the S7 expressway on the Koszwali – Elbląg section with a total length of 39.63 km, which is entirely located in the TEN-T core network. This investment consists of two project tasks: • Task 1: Koszwali – Nowy Dwór Gdański, • Task 2: Nowy Dwór Gdański – Kazimierzowo. The beginning of this investment is located at the end of the Gdańsk Ring Road in km 17 + 482,61. The route was designed partly o...
  • curprev 14:4714:47, 14 October 2020DG Regio talk contribs 15,323 bytes −1,369 Removed claim: summary (P836): The main part of the project is the construction of the S7 expressway in the section ‘Cost — Elbląg g’ with a total length of 39.63 km, which is fully located on the TEN-T core network The investment in question consists of two project tasks:• Task 1:Cost — Nowy Dwór Gdansk,• Task 2:Nowy Dwór Gdański — Kazimierz.The beginning of the investment in question is located at the end of the southern city of Gdańsk at km 17 + 482,61.The route is partl...

23 September 2020

15 July 2020

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:5909:59, 4 March 2020DG Regio talk contribs 13,326 bytes +1,369 Created claim: summary (P836): The main part of the project is the construction of the S7 expressway in the section ‘Cost — Elbląg g’ with a total length of 39.63 km, which is fully located on the TEN-T core network The investment in question consists of two project tasks:• Task 1:Cost — Nowy Dwór Gdansk,• Task 2:Nowy Dwór Gdański — Kazimierz.The beginning of the investment in question is located at the end of the southern city of Gdańsk at km 17 + 482,61.The route is partly...

18 February 2020

8 February 2020

31 January 2020

14 January 2020