Improving the quality of the urban environment of Świętochłowice commune – remediation of degraded and contaminated areas in the Kalina pond with restoration of its biological activity (Q85727): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: financed by (P890): Directorate-General for Regional and Urban Policy (Q8361), Removing unnecessary financed by statement)
Property / beneficiaryProperty / beneficiary

Revision as of 08:47, 26 November 2020

Project Q85727 in Poland
Language Label Description Also known as
English
Improving the quality of the urban environment of Świętochłowice commune – remediation of degraded and contaminated areas in the Kalina pond with restoration of its biological activity
Project Q85727 in Poland

    Statements

    0 references
    59,258,521.78 zloty
    0 references
    14,222,045.23 Euro
    13 January 2020
    0 references
    69,715,907.98 zloty
    0 references
    16,731,817.92 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2022
    0 references
    GMINA ŚWIĘTOCHŁOWICE
    0 references
    0 references

    50°17'56.0"N, 18°54'27.0"E
    0 references
    Inwestycja zlokalizowana jest w województwie śląskim, w mieście na prawach powiatu Świętochłowice. Projekt realizowany będzie na działkach stanowiących własność beneficjenta o numerach 3821/1, 3819, 3816, 1133/14, 3813, 97, 98, 3657, 835/107, 1396/84,1398/113. Teren objęty inwestycją bezpośrednio sąsiaduje z użytkiem ekologicznym - Lasem na Górze Hugona (bezpośrednie sąsiedztwo z działką nr 3816 wchodzącą w obszar projektu - szczegóły roz. 2.1.1 SW). Zakres projektu obejmuje remediację zdegradowanych i zanieczyszczonych terenów w rejonie stawu Kalina wraz z przywróceniem biologicznej aktywności samego stawu. Łączna powierzchnia terenu poddanego remediacji wynosi 10,44 ha. Zarówno na terenach objętych wnioskiem jak i na terenach sąsiednich nie występują: ujęcia wód,tereny sportowe, przychodnie, szkoły, szpitale,place zabaw. Występują natomiast budynki mieszkalne oraz ogrórdki działkowe.Występują formy ochrony przyrody - użytek ekologiczny - Las na Górze Hugona. W ramach projektu przewidziano następujące prace: 1. Remediacja środowiska gruntowo – wodnego z zachowaniem niżej podanych kierunków działań: -I KIERUNEK – Odcięcie wpływu zanieczyszczeń z rejonu hałdy poprzez zastosowanie ścian szczelnych wokół podstawy hałdy w celu wyeliminowania dalszego napływu zanieczyszczeń. -II KIERUNEK – Usuwanie osadu dennego i bioremediacja wód zbiornika dla wyeliminowania możliwości wtórnego zanieczyszczenia gruntu wodami ze zbiornika. -III KIERUNEK – Prowadzenie remediacji gruntu z zastosowaniem metod in – situ, bioremediacji i fitoremediacji. 2.Przyrodnicze zagospodarowanie terenu - nasadzenia roślinności, 3.Docelowe zagospodarowanie terenu wraz z montażem małej architektury. W wyniku realizacji projektu nastąpi utworzenie nowych powierzchni biologicznie czynnych docelowo 9,23 ha, (Polish)
    0 references
    The investment is located in the Silesian Voivodeship, in the city under the rights of the Świętochłowice district. The project will be implemented on parcels owned by the beneficiary with numbers 3821/1, 3819, 3816, 1133/14, 3813, 97, 98, 3657, 835/107, 1396/84,1398/113. The area covered by the investment is directly adjacent to ecological land – Forest on Mount Hugona (direct neighbourhood with plot No. 3816 entering the project area – details. 2.1.1 SW). The scope of the project includes the remediation of degraded and contaminated areas in the Kalina pond area with the restoration of biological activity of the pond itself. The total area of the remediated area shall be 10.44 ha. In the areas covered by the application and in neighbouring areas, there are no: water intakes, sports grounds, clinics, schools, hospitals, playgrounds. There are residential buildings and land gardens.There are forms of nature conservation – ecological use – forest on Mount Hugona. The project envisages the following work: 1. Remediation of the ground-water environment with the following directions of action: —I KIERUNEK – Cutting the impact of pollutants from the heap region by using tight walls around the base of the heap to eliminate further influx. —II KIERUNEK – Removal of bottom sediment and bioremediation of reservoir water to eliminate the possibility of secondary ground contamination by water from the reservoir. —III KIERUNEK – Conducting land remediation using in-situ, bioremediation and phytoremediation methods. 2.Natural land use – planting of vegetation, 3. Target land development with installation of small architecture. As a result of the project, new biologically active surfaces will be created, targeting 9.23 ha, (English)
    14 October 2020
    0 references

    Identifiers

    POIS.02.05.00-00-0105/16
    0 references