Revision history of "Energy modernisation of the industrial plant Forest Gorlice Sp. z o. o." (Q84445)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

14 June 2023

10 June 2023

24 May 2023

2 March 2023

  • curprev 20:4120:41, 2 March 2023DG Regio talk contribs 56,162 bytes +586 Changed label, description and/or aliases in lv, pt, cs, fi, lt, sl, da, sk, ro, el, hr, it, hu, ga, sv, fr, nl, de, mt, et, bg, es, and other parts

2 December 2022

25 October 2022

19 October 2022

26 July 2022

  • curprev 03:4703:47, 26 July 2022DG Regio talk contribs 53,880 bytes +32,747 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

19 January 2022

15 January 2022

16 December 2021

7 December 2021

30 November 2021

  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 13,959 bytes +1,748 Created claim: summary (P836): L’objectif principal du projet est de: — Construction d’une chaufferie ainsi que d’un entrepôt de biomasse, en tant que nouveau bâtiment indépendant, d’un étage avec un toit à pignon, qui doit remplacer la chaufferie existante fabriquée dans l’ancienne technologie. Dimensions du nouveau bâtiment: Longueur: 32,13 m (18,38 m chaufferie bâtiment,13,75 m entrepôt de carburant — abri) W:18,48 m Height:10,57 m Pow. zabudowy:592,88m2, Espace total: 630...
  • curprev 16:3516:35, 30 November 2021DG Regio talk contribs 12,211 bytes +116 Changed label, description and/or aliases in fr: translated_label

25 July 2021

29 October 2020

14 October 2020

  • curprev 13:0213:02, 14 October 2020DG Regio talk contribs 12,122 bytes +130 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 13:0213:02, 14 October 2020DG Regio talk contribs 11,992 bytes −109 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 13:0213:02, 14 October 2020DG Regio talk contribs 12,101 bytes +1,599 Created claim: summary (P836): The main objective of the project is to: — Construction of a boiler room with a biomass storage facility, as a new freestanding building, one-storey with a two-stage roof, which replaces existing boiler room made in old technology. Dimensions of the new building: Length:32.13 m (18.38 m boiler room building,13,75 m fuel storage – world) Wide:18.48 m Height:10,57 m Overall:592.88 m², Total area: 630,85 m², usable area: 609,85 m², Kubatura: 4940,6...
  • curprev 13:0213:02, 14 October 2020DG Regio talk contribs 10,502 bytes −1,118 Removed claim: summary (P836): The main objective of the project is to:— Building a boiler together with a biomass storage facility, as a new free-standing building, with a two-storey roof, replacing it with an existing boiler installed in the old technology.Size of the new building:D.: 32,13M (18.38 m boiler room, 13.75 m entrance tank): 18,48 M Os.: 10,57M Pow. zabudowy:592,88m2, Pow. total:630.85 m², for use:609.85 m², volume:4 940.63 m³, — boiler equipment in 2 biomass...

22 June 2020

9 June 2020

7 June 2020

26 March 2020

4 March 2020

  • curprev 09:3909:39, 4 March 2020DG Regio talk contribs 10,332 bytes +1,118 Created claim: summary (P836): The main objective of the project is to:— Building a boiler together with a biomass storage facility, as a new free-standing building, with a two-storey roof, replacing it with an existing boiler installed in the old technology.Size of the new building:D.: 32,13M (18.38 m boiler room, 13.75 m entrance tank): 18,48 M Os.: 10,57M Pow. zabudowy:592,88m2, Pow. total:630.85 m², for use:609.85 m², volume:4 940.63 m³, — boiler equipment in 2 biomass bo...

18 February 2020

8 February 2020

31 January 2020

14 January 2020