Revision history of "Road I/9, I/16 Mělník, bypass, 1st construction" (Q57670)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

22 December 2023

12 June 2023

10 March 2023

9 March 2023

17 February 2023

24 July 2022

  • curprev 02:0902:09, 24 July 2022DG Regio talk contribs 50,795 bytes +28,179 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

8 February 2022

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 20:5520:55, 2 December 2021DG Regio talk contribs 16,091 bytes +1,434 Created claim: summary (P836): Gegenstand des Projekts ist der Bau der I/9-Straßenumstellung in der Kategorie MS2 8.5/50 für die Gesamtlänge der Hauptstrecke 0,799 km. Der Bau verläuft zunächst entlang der Strecke der bestehenden Prager Straße und dann entlang der Route des ursprünglichen Anschlusses der Zuckerfabrik Mělník. Die Verbindung zu bestehenden Straßen wird durch die Kreuzungen von Prag und Mladoboleslavská Straße gelöst. Die Durchführung des Projekts wird die Belas...
  • curprev 20:5420:54, 2 December 2021DG Regio talk contribs 14,657 bytes +101 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 22:1222:12, 28 November 2021DG Regio talk contribs 14,556 bytes +1,472 Created claim: summary (P836): L’objet du projet est la construction de la route I/9 repositionnée dans la catégorie MS2 8,5/50 pour la longueur totale de la route principale 0,799 km. La construction s’étend d’abord sur la route de la rue existante de Prague, puis sur la voie d’évitement d’origine de la sucrerie de Mělník. Le raccordement aux routes existantes est résolu par les intersections de Prague et de la rue Mladoboleslavská. La mise en œuvre du projet permettra d’all...
  • curprev 22:1222:12, 28 November 2021DG Regio talk contribs 13,084 bytes +118 Changed label, description and/or aliases in fr: translated_label

28 October 2020

23 October 2020

  • curprev 10:3910:39, 23 October 2020DG Regio talk contribs 13,411 bytes +108 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3910:39, 23 October 2020DG Regio talk contribs 13,303 bytes −106 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3910:39, 23 October 2020DG Regio talk contribs 13,409 bytes +1,394 Created claim: summary (P836): The object of the project is the construction of the relocation of road I/9 in category MS2 8.5/50 in the total length of the main route 0.799 km. The construction first leads on the route of the existing Prague Street and then on the route of the original line of the Mělník sugar mill. The connection to the existing roads is solved by circular crossroads in Prague and Mladadoboleslavská Street. The implementation of the project will reduce the...
  • curprev 10:3910:39, 23 October 2020DG Regio talk contribs 12,015 bytes −949 Removed claim: summary (P836): The purpose of the project is the construction of the I/9 road in category MS2 8,5/50 in the total length of the main route of 0.799 km. The construction works first on the route of the existing Prague street and, subsequently, in the original body of the board of the Melník. The connection to the existing communication is addressed by ring tracks in Prague and the Mladá oblesvské Street. The implementation of the project will reduce the burde...

22 September 2020

17 July 2020

7 June 2020

26 March 2020

26 February 2020

  • curprev 10:4110:41, 26 February 2020DG Regio talk contribs 11,682 bytes +949 Created claim: summary (P836): The purpose of the project is the construction of the I/9 road in category MS2 8,5/50 in the total length of the main route of 0.799 km. The construction works first on the route of the existing Prague street and, subsequently, in the original body of the board of the Melník. The connection to the existing communication is addressed by ring tracks in Prague and the Mladá oblesvské Street. The implementation of the project will reduce the burden...

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

11 January 2020