Suloglu and Sozopol - Informed, Trained, Equipped (Q4300225)

From EU Knowledge Graph
Revision as of 09:25, 17 June 2022 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q4300225 in Bulgaria, Turkey
Language Label Description Also known as
English
Suloglu and Sozopol - Informed, Trained, Equipped
Project Q4300225 in Bulgaria, Turkey

    Statements

    0 references
    0 references
    0 references
    0 references
    493,668.97 Euro
    0 references
    580,787.03 Euro
    0 references
    85.0 percent
    0 references
    23 July 2019
    0 references
    23 July 2021
    0 references
    Municipality of Suloglu
    0 references

    42°25'9.08"N, 27°41'38.08"E
    0 references

    41°47'55.97"N, 26°55'32.16"E
    0 references
    1. Repair of a building in Suloglu intended for Disaster Management Center- disaster management center will be established in Suloglu. 2. Reconstruction of the Fire Station building – building in Sozopol, used as Fire Station will be extended. 3. Supply of road vehicles and specialized equipment for rescue in fires and floods- for Suloglu and Sozopol. 4. Information and publicity-informational campaigns in both towns. 5. Joint elaboration of educational materials for the local population - chronology of emergency actions-round table will be conducted between the partners to discuss the actions which will be included in informational leaflet. 6. Joint training of disaster response teams from Sozopol and Suloglu for use of the equipment in emergencies. (English)
    0 references

    Identifiers

    0 references