Revision history of "RAILNET: RENOVATION INTEGRATED MULTISERVICE NETWORK (RIM) LINE 8 METRO. PROVISION AND INSTALLATION OF WIFI INFRASTRUCTURE FOR OPERATION IN 40 STATIONS AND SUPPLY OF NETWORK SWITCHES" (Q3133977)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

12 June 2023

4 August 2022

  • curprev 06:0706:07, 4 August 2022DG Regio talk contribs 56,156 bytes +36,514 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

16 January 2022

17 December 2021

9 December 2021

2 December 2021

  • curprev 09:0109:01, 2 December 2021DG Regio talk contribs 13,159 bytes +1,956 Created claim: summary (P836): RAILNET: Modernisation des systèmes de télécommunications ferroviaires à large bande et d’un réseau multiservices intégré à grande capacité. Tout cela dans le but de promouvoir une mobilité intelligente, durable et innovante par la transformation numérique des systèmes d’exploitation et de sécurité du réseau métropolitain de Madrid, ainsi que d’accroître la capacité d’exploitation des trains et la fourniture de nouveaux services commerciaux (nou...
  • curprev 09:0109:01, 2 December 2021DG Regio talk contribs 11,203 bytes +268 Changed label, description and/or aliases in fr: translated_label

10 October 2021

9 October 2021

7 October 2021