Revision history of "Requalification of the Monsanto Interpretation Centre" (Q2880636)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 June 2023

23 May 2023

4 November 2022

29 July 2022

  • curprev 09:4709:47, 29 July 2022DG Regio talk contribs 42,322 bytes +25,452 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv, nl, fr, de, it, pt, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, da, ro, sv,

20 January 2022

17 January 2022

19 December 2021

13 December 2021

4 December 2021

20 October 2021

13 September 2021

7 July 2021

  • curprev 21:5421:54, 7 July 2021DG Regio talk contribs 9,464 bytes +431 Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string
  • curprev 10:5610:56, 7 July 2021DG Regio talk contribs 9,033 bytes +112 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5610:56, 7 July 2021DG Regio talk contribs 8,921 bytes +1,233 Created claim: summary (P836): The measures cover interventions in the thermal insulation of walls and roofs, replacement of glazed spans, installation of external shadings, replacement of existing lighting, installation of a solar photovoltaic system for self-consumption and a stove of heat and replacement of climatisation systems.Technical monitoring and independent ex post evaluation,includes the new emission of the Energy Certificate., translated_summary

6 July 2021