Modernisation of technical school campus in Iasi – Gheorghe Asachi Technical College (Q2741220): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claims)
Tag: Replaced
Property / instance of
 
Property / instance of: Kohesio project / rank
Normal rank
 
Property / financed by
 
Property / financed by: European Union / rank
Normal rank
 
Property / intervention field
 
Property / intervention field: Education infrastructure for vocational education and training and adult learning / rank
Normal rank
 
Property / country
 
Property / country: Romania / rank
Normal rank
 
Property / EU contribution
6,284,001.5 Romanian Leu
Amount6,284,001.5 Romanian Leu
UnitRomanian Leu
 
Property / EU contribution: 6,284,001.5 Romanian Leu / rank
Normal rank
 
Property / EU contribution
1,256,800.3 Euro
Amount1,256,800.3 Euro
UnitEuro
 
Property / EU contribution: 1,256,800.3 Euro / rank
Preferred rank
 
Property / EU contribution: 1,256,800.3 Euro / qualifier
exchange rate to Euro: 0.2 Euro
Amount0.2 Euro
UnitEuro
 
Property / EU contribution: 1,256,800.3 Euro / qualifier
point in time: 15 June 2021
Timestamp+2021-06-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / budget
7,392,942.930000001 Romanian Leu
Amount7,392,942.930000001 Romanian Leu
UnitRomanian Leu
 
Property / budget: 7,392,942.930000001 Romanian Leu / rank
Normal rank
 
Property / budget
1,478,588.5860000001 Euro
Amount1,478,588.5860000001 Euro
UnitEuro
 
Property / budget: 1,478,588.5860000001 Euro / rank
Preferred rank
 
Property / budget: 1,478,588.5860000001 Euro / qualifier
exchange rate to Euro: 0.2 Euro
Amount0.2 Euro
UnitEuro
 
Property / budget: 1,478,588.5860000001 Euro / qualifier
point in time: 15 June 2021
Timestamp+2021-06-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / co-financing rate
0.85 percent
Amount0.85 percent
Unitpercent
 
Property / co-financing rate: 0.85 percent / rank
Normal rank
 
Property / start time
11 May 2020
Timestamp+2020-05-11T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / start time: 11 May 2020 / rank
Normal rank
 
Property / end time
28 February 2023
Timestamp+2023-02-28T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / end time: 28 February 2023 / rank
Normal rank
 
Property / beneficiary name (string)
UAT MUNICIPIUL IASI
 
Property / beneficiary name (string): UAT MUNICIPIUL IASI / rank
Normal rank
 
Property / location (string)
IASI, IASI
 
Property / location (string): IASI, IASI / rank
Normal rank
 
Property / summary
Lucrari de modernizare a campusului scolar din cadrul Colegiului tehnic Gheorghe Asachi Iasi, care vizează dezvoltarea infrastructurii (spatiilor si dotarilor adecvate) in care se desfasoara procesul educational, in vederea asigurarii unor rezultate educationale mai bune in paralel cu promovarea participarii si reintegrarea parintilor pe piata muncii. (Romanian)
 
Property / summary: Lucrari de modernizare a campusului scolar din cadrul Colegiului tehnic Gheorghe Asachi Iasi, care vizează dezvoltarea infrastructurii (spatiilor si dotarilor adecvate) in care se desfasoara procesul educational, in vederea asigurarii unor rezultate educationale mai bune in paralel cu promovarea participarii si reintegrarea parintilor pe piata muncii. (Romanian) / rank
Normal rank
 
Property / summary
Modernisation of the school campus within Gheorghe Asachi Iasi Technical College, aimed at developing the appropriate infrastructure (spaces and facilities) in which the educational process takes place, in order to ensure better educational results in parallel with the promotion of participation and reintegration of parents on the labour market. (English)
 
Property / summary: Modernisation of the school campus within Gheorghe Asachi Iasi Technical College, aimed at developing the appropriate infrastructure (spaces and facilities) in which the educational process takes place, in order to ensure better educational results in parallel with the promotion of participation and reintegration of parents on the labour market. (English) / rank
Normal rank
 
Property / summary: Modernisation of the school campus within Gheorghe Asachi Iasi Technical College, aimed at developing the appropriate infrastructure (spaces and facilities) in which the educational process takes place, in order to ensure better educational results in parallel with the promotion of participation and reintegration of parents on the labour market. (English) / qualifier
point in time: 17 June 2021
Timestamp+2021-06-17T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 
Property / coordinate location
47°9'41.51"N, 27°35'1.00"E
Latitude47.1615341
Longitude27.5836142
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
 
Property / coordinate location: 47°9'41.51"N, 27°35'1.00"E / rank
Normal rank
 
Property / contained in NUTS
 
Property / contained in NUTS: Iaşi / rank
Normal rank
 
Property / beneficiary
Q2752764 (Deleted Item)
 
Property / beneficiary: Q2752764 (Deleted Item) / rank
Normal rank
 

Revision as of 13:10, 14 September 2021

Project Q2741220 in Romania
Language Label Description Also known as
English
Modernisation of technical school campus in Iasi – Gheorghe Asachi Technical College
Project Q2741220 in Romania

    Statements

    Identifiers

    126440
    0 references