Revision history of "North-East Region – Strategic Road Axis 2: Botosani-Iasi" (Q2741044)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

10 June 2023

21 February 2023

21 December 2022

28 July 2022

  • curprev 05:1305:13, 28 July 2022DG Regio talk contribs 46,532 bytes +24,130 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv, nl, fr, de, it, ro, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, pl, hu, cs, lv, ga, sl, bg, mt, pt, da, sv,

13 January 2022

12 January 2022

5 December 2021

1 December 2021

  • curprev 06:2206:22, 1 December 2021DG Regio talk contribs 18,568 bytes +1,134 Created claim: summary (P836): Stärkung des wirtschaftlichen und sozialen Zusammenhalts auf Ebene der Kreise Botosani und Iasi durch Verbesserung der Verkehrsinfrastruktur und Erleichterung des Zugangs zu nationalen und europäischen Strecken in der Region, Anbindung an die Kreisverkehrsnetze mit Zugang zum TEN-V-Netz und Iasi-Wachstumspol., translated_summary
  • curprev 06:2206:22, 1 December 2021DG Regio talk contribs 17,434 bytes +122 Changed label, description and/or aliases in de: translated_label

26 November 2021

  • curprev 08:4108:41, 26 November 2021DG Regio talk contribs 17,312 bytes +1,178 Created claim: summary (P836): Accroître le degré de cohésion économique et sociale au niveau des comtés de Botosani et d’Iasi, en améliorant les infrastructures de transport et en facilitant l’accès aux routes nationales et européennes dans la région, l’interconnexion aux réseaux de transport départementaux avec accès au réseau RTE-T et au pôle de croissance Iasi., translated_summary
  • curprev 08:4108:41, 26 November 2021DG Regio talk contribs 16,134 bytes +119 Changed label, description and/or aliases in fr: translated_label

6 October 2021

5 October 2021

27 September 2021

23 September 2021

17 September 2021

15 September 2021

14 September 2021

21 June 2021

17 June 2021

  • curprev 10:5810:58, 17 June 2021DG Regio talk contribs 10,641 bytes +117 Changed label, description and/or aliases in en: translated_label
  • curprev 10:5810:58, 17 June 2021DG Regio talk contribs 10,524 bytes +1,122 Created claim: summary (P836): Increasing the level of economic and social cohesion in Botosani and Iasi counties, by improving transport infrastructure and facilitating access to national and European routes in the region, interconnection to the county transport networks with access to the TEN-T network and the Iasi Growth Pole., translated_summary

15 June 2021