Protection and sustainable development of the Lido de Sète in Marseillan – Slice 5 (Q146430): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in 1 language: remove_english_label)
(‎Changed label, description and/or aliases in 1 language: translated_label)
label / enlabel / en
 
Protection and sustainable development of the Lido de Sète in Marseillan – Slice 5

Revision as of 14:41, 12 October 2020

Project in France financed by DG Regio
Language Label Description Also known as
English
Protection and sustainable development of the Lido de Sète in Marseillan – Slice 5
Project in France financed by DG Regio

    Statements

    0 references
    1,081,080.0 Euro
    0 references
    3,861,000.0 Euro
    0 references
    28.0 percent
    0 references
    11 May 2016
    0 references
    30 April 2019
    0 references
    Sète Agglopôle Méditerranée (SAM)
    0 references
    0 references

    43°30'38.77"N, 3°48'21.67"E
    0 references
    34110
    0 references
    Le projet de protection et aménagement durable du Lido de Sète à Marseillan entre dans sa dernière phase opérationnelle, la phase 5, qui consiste à déployer l'atténuateur de houle sur 1400 m supplémentaire pour arriver à terme à un ouvrage immergé sur 2 400 m. (French)
    0 references
    The project for the protection and sustainable development of the Lido de Sète in Marseillan is entering its last operational phase, Phase 5, which consists of deploying the swell attenuator to an additional 1400 m to complete a 2400 m submerged structure. (English)
    12 October 2020
    0 references
    The Sète lido in Marseillan, France. (English)
    Creative Commons
    0 references

    Identifiers

    4248
    0 references
    5208
    0 references