Revision history of "Construction of engineering hall and revitalisation of the complex. DTZ s.r.o." (Q14493)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

22 December 2023

11 June 2023

20 February 2023

17 February 2023

3 July 2022

  • curprev 02:2902:29, 3 July 2022DG Regio talk contribs 43,144 bytes +24,929 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 09:3209:32, 2 December 2021DG Regio talk contribs 14,252 bytes +1,170 Created claim: summary (P836): Das Projekt befasst sich mit dem Abriss bestehender Altbauten im DTZ s.r.o. und dem anschließenden Bau eines Neubaus, einschließlich der Revitalisierung von gepflasterten Flächen. Am Ende des Projekts wird das Unternehmen über mehr Produktions- und Lagerflächen verfügen, um die Kapazität und Effizienz seines Produktionsprozesses zu erhöhen., translated_summary
  • curprev 09:3209:32, 2 December 2021DG Regio talk contribs 13,082 bytes +138 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 18:1318:13, 28 November 2021DG Regio talk contribs 12,944 bytes +1,207 Created claim: summary (P836): Le projet porte sur la démolition d’anciens bâtiments existants dans les locaux de DTZ s.r.o. et la construction ultérieure d’un nouveau bâtiment, y compris la revitalisation des zones pavées. À la fin du projet, l’entreprise disposera de plus d’espaces de production et de stockage à utiliser pour augmenter la capacité et l’efficacité de son processus de production., translated_summary
  • curprev 18:1318:13, 28 November 2021DG Regio talk contribs 11,737 bytes +147 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 16:0416:04, 22 October 2020DG Regio talk contribs 12,039 bytes +1,176 Created claim: summary (P836): The project deals with demolition of existing existing buildings on the premises of DTZ s.r.o. and subsequent construction of a new building including revitalisation of paved areas. After the end of the project, the company will have more production and storage areas, which it will use to increase the capacity and efficiency of its production process. a., translated_summary
  • curprev 16:0416:04, 22 October 2020DG Regio talk contribs 10,863 bytes −723 Removed claim: summary (P836): The project addresses the demolition of existing permanent objects at the DTZ s.r.o. site and the subsequent construction of the new building, including the revitalisation of the paved areas. At the end of the project, the company will have more production and storage areas which it will use to increase the capacity and effectiveness of the process., remove_old_english_translation
  • curprev 06:5306:53, 22 October 2020DG Regio talk contribs 11,586 bytes +137 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 06:5306:53, 22 October 2020DG Regio talk contribs 11,449 bytes −145 Changed label, description and/or aliases in 1 language: remove_english_label

24 September 2020

22 September 2020

15 July 2020

6 June 2020

25 March 2020

19 March 2020

25 February 2020

  • curprev 11:0311:03, 25 February 2020DG Regio talk contribs 10,320 bytes +723 Created claim: summary (P836): The project addresses the demolition of existing permanent objects at the DTZ s.r.o. site and the subsequent construction of the new building, including the revitalisation of the paved areas. At the end of the project, the company will have more production and storage areas which it will use to increase the capacity and effectiveness of the process., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020