Revision history of "Use of renewable energy sources in buildings belonging to Uzdrowiska Goczałkowice-Zdrój Sp. z o.o. in order to increase the level of energy production from renewable sources." (Q123723)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3819:38, 2 March 2023DG Regio talk contribs 56,056 bytes +166 Changed label, description and/or aliases in sk, lv, it, da, cs, et, fi, fr, bg, hu, sl, ga, pt, hr, ro, es, el, lt, nl, sv, de, mt, and other parts

25 October 2022

22 October 2022

2 July 2022

  • curprev 19:5519:55, 2 July 2022DG Regio talk contribs 54,229 bytes +32,635 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

8 December 2021

2 December 2021

  • curprev 07:5107:51, 2 December 2021DG Regio talk contribs 14,525 bytes +1,689 Created claim: summary (P836): Le projet consiste à utiliser des solutions respectueuses de l’environnement pour la production d’électricité, de chaleur et de refroidissement en utilisant des solutions innovantes dans l’utilisation de sources renouvelables, c’est-à-dire des panneaux photovoltaïques et des pompes à chaleur. Dans le cadre de l’investissement, il est prévu d’installer des panneaux photovoltaïques d’une capacité totale de 134,68 kWp sur les bâtiments d’Uzdrowiska...
  • curprev 07:5107:51, 2 December 2021DG Regio talk contribs 12,836 bytes +257 Changed label, description and/or aliases in fr: translated_label

29 October 2020

21 October 2020

  • curprev 10:3810:38, 21 October 2020DG Regio talk contribs 13,018 bytes +236 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:3810:38, 21 October 2020DG Regio talk contribs 12,782 bytes −237 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:3810:38, 21 October 2020DG Regio talk contribs 13,019 bytes +1,440 Created claim: summary (P836): The project consists of eco-friendly solutions for the production of electricity, heat and cooling using innovative solutions in the use of renewable sources, i.e. photovoltaic panels and heat pumps. The investment plans to install photovoltaic panels with a total capacity of 134.68 kWp on buildings of Uzdrowiska Goczałkowice-Zdrój Sp. z o.o. in order to produce electricity for the health resort, as well as heat pumps with a total capacity of 34...
  • curprev 10:3810:38, 21 October 2020DG Regio talk contribs 11,579 bytes −992 Removed claim: summary (P836): The project consists of the use of green solutions for the generation of electricity, heating and cooling, using innovative solutions in the use of renewable sources, i.e. photovoltaic panels and heat pumps. As part of the investment, it is planned to install the solar panels with a total capacity of 134,68 kWp on the GoLverkowice-Zdrój Sp. z o.o. buildings in order to produce electricity for spas and heat pumps with a total capacity of 341.4 ...

24 September 2020

17 July 2020

22 June 2020

10 June 2020

6 June 2020

26 March 2020

10 March 2020

  • curprev 10:0210:02, 10 March 2020DG Regio talk contribs 10,849 bytes +992 Created claim: summary (P836): The project consists of the use of green solutions for the generation of electricity, heating and cooling, using innovative solutions in the use of renewable sources, i.e. photovoltaic panels and heat pumps. As part of the investment, it is planned to install the solar panels with a total capacity of 134,68 kWp on the GoLverkowice-Zdrój Sp. z o.o. buildings in order to produce electricity for spas and heat pumps with a total capacity of 341.4 kW...

25 February 2020

18 February 2020

31 January 2020

14 January 2020