Revision history of "Shared Infrastructure – CLUTEX II" (Q12079)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 March 2024

15 January 2024

11 June 2023

17 February 2023

2 July 2022

  • curprev 18:4618:46, 2 July 2022DG Regio talk contribs 43,779 bytes +24,679 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

12 December 2021

2 December 2021

  • curprev 08:0208:02, 2 December 2021DG Regio talk contribs 15,207 bytes +1,224 Created claim: summary (P836): Ziel des Projekts ist es, die gemeinsame Ausrüstung des Clusters zu ergänzen, die erforderlich ist, um die geplanten RVI-Aktivitäten zu gewährleisten. Dabei handelt es sich um den Erwerb von Mess- und Laborgeräten zur Messung und Detektion spezifischer Eigenschaften, insbesondere medizinische Textilien, Textilien für persönliche Schutzausrüstungen und andere fortgeschrittene Textilmaterialien., translated_summary
  • curprev 08:0208:02, 2 December 2021DG Regio talk contribs 13,983 bytes +97 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 09:2909:29, 28 November 2021DG Regio talk contribs 13,886 bytes +1,238 Created claim: summary (P836): L’objectif du projet est de compléter l’équipement partagé du pôle nécessaire pour assurer les activités de RVI prévues. Il s’agit de l’acquisition d’équipements de mesure et de laboratoire pour mesurer et détecter des propriétés spécifiques, en particulier les textiles médicaux, les textiles destinés à des équipements de protection individuelle et d’autres matériaux textiles de pointe., translated_summary
  • curprev 09:2909:29, 28 November 2021DG Regio talk contribs 12,648 bytes +97 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 15:1115:11, 22 October 2020DG Regio talk contribs 13,000 bytes +1,179 Created claim: summary (P836): The aim of the project is to complement the shared equipment of the cluster necessary to ensure the planned VVI activities. It is the acquisition of measuring and laboratory techniques for measuring and detecting specific characteristics especially of medical textiles, textiles intended for personal protective equipment and other advanced textile materials., translated_summary
  • curprev 15:1115:11, 22 October 2020DG Regio talk contribs 11,821 bytes −726 Removed claim: summary (P836): The project aims at complementing the pooled equipment of the cluster necessary to provide the planned VVI activities. These are the acquisition of measuring and laboratory techniques to measure and identify the specific characteristics of, in particular, medical textiles, textiles for personal protective equipment and other advanced textile materials., remove_old_english_translation
  • curprev 07:2707:27, 22 October 2020DG Regio talk contribs 12,547 bytes +94 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:2707:27, 22 October 2020DG Regio talk contribs 12,453 bytes −95 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

6 June 2020

25 March 2020

26 February 2020

  • curprev 07:5007:50, 26 February 2020DG Regio talk contribs 11,257 bytes +726 Created claim: summary (P836): The project aims at complementing the pooled equipment of the cluster necessary to provide the planned VVI activities. These are the acquisition of measuring and laboratory techniques to measure and identify the specific characteristics of, in particular, medical textiles, textiles for personal protective equipment and other advanced textile materials., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020