Energy renovation of public buildings in the municipality of Dębica (Q118689)

From EU Knowledge Graph
Revision as of 13:04, 10 March 2020 by Wildmax (talk | contribs) (‎Changed claim: summary (P836): The aim of the project is to increase the energy efficiency of public buildings through comprehensive thermal modernization of the following buildings: Building B at the School Complex in Głobikowa, it is planned to implement an investment consisting in: insulation of external walls on the building (building with a ridge height of 7.85 m), insulation of the ceiling above the ground floor along with the construction of the floor on joists, replac...)
Jump to navigation Jump to search
Project in Poland financed by DG Regio
Language Label Description Also known as
English
Energy renovation of public buildings in the municipality of Dębica
Project in Poland financed by DG Regio

    Statements

    0 references
    763,660.66 zloty
    0 references
    183,278.5584 Euro
    13 January 2020
    0 references
    1,113,124.58 zloty
    0 references
    267,149.8992 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    30 November 2015
    0 references
    29 December 2017
    0 references
    GMINA DĘBICA
    0 references
    Celem projektu jest zwiększenie efektywności energetycznej budynków użyteczności publicznej poprzez kompleksową termomodernizację następujących budynków: Budynek B przy Zespole Szkół w Głobikowej planuje się realizację inwestycji polegającej na:dociepleniu ścian zewnętrznych na budynku (budynek o wysokości do kalenicy 7,85 m),docieplenie stropu nad parterem wraz z wykonaniem podłogi na legarach,wymianę drzwi zewnętrznych,docieplenie i hydroizolacja ścian fundamentowych wraz z odbojem z kostki brukowej,wymiana opraw oświetleniowych na LEDowe.Budynek B przy Zespole Szkół w Stasiówce planuje się wykonać:docieplenie ścian zewnętrznych (budynek o wysokości do kalenicy 9,12 m),docieplenie stropu nad parterem wraz z wykonaniem podłogi na legarach,częściową wymianę stolarki okiennej i drzwiowejdocieplenie i hydroizolacja ścian fundamentowych wraz z odbojem z kostki brukowej,wymiana opraw oświetleniowych na LEDowe.Zespół Szkół w Latoszynie planuje się wykonać,docieplenie ścian zewnętrznych Sali gimnastycznej (budynek o wysokości do kalenicy 9,90 m),wymianę stolarki okiennej w Sali gimnastycznejwymianę kotła żeliwnego niskotemperaturowego na kocioł kondensacyjnyRemiza OSP w Pustyni planuje się wykonać,docieplenie ścian zewnętrznych (budynek o wysokości do kalenicy 8,81 m),docieplenie i hydroizolacja ścian fundamentowych wraz z odbojem z kostki brukowej,docieplenie stropu nad parterem i pierwszym piętrem,wykonanie podłogi na legarach,docieplenie części połaci dachowych,wymianę stolarki okiennej i drzwiowej,wymianę źródła ciepła wraz z instalacją c.o.,wymiana opraw oświetleniowych na LEDowewymiana kotła żeliwnego niskotemperaturowego na kocioł kondensacyjnyRemiza OSP w Pustkowie – Strachowie w ramach inwestycji planowana jest:wymiana opraw oświetleniowych na LEDowe,docieplenie i hydroizolacja ścian fundamentowych wraz z odbojem z kostki brukowej,wymiana starego nieenergooszczędnego kotła na kocioł kondensacyjny wraz z nową instalacją c.o. i c.w.u. (Polish)
    0 references
    The aim of the project is to increase the energy efficiency of public buildings through comprehensive thermal modernization of the following buildings: Building B at the School Complex in Głobikowa, it is planned to implement an investment consisting in: insulation of external walls on the building (building with a ridge height of 7.85 m), insulation of the ceiling above the ground floor along with the construction of the floor on joists, replacement of external doors, insulation and waterproofing of foundation walls together with bumpers, replacement of lighting fittings with LED ones. Building B at the School Complex in Stasiówce is planned to perform: insulation of external walls (building up to the ridge height 9 , 12 m), insulation of the ceiling above the ground floor with execution of the floor on joists, partial replacement of window and door joinery insulation and waterproofing of foundation walls together with bumpers, replacement of lighting fittings with LED ones. The School Complex in Latoszyn is planned insulate the external walls of the gym (building with a ridge height of 9.90 m), replace the window carpentry in the gym Replace the low-temperature cast iron boiler with a condensing boiler The fire station in the Desert is planned to perform insulation of the external walls (building with a ridge height of 8.81 m), insulation and waterproofing of foundation walls together with a boulder block, insulation of the ceiling above the ground floor and first floor, floor construction on joists, insulation of roof slopes, replacement of window and door joinery, replacement of the heat source with central heating installation, replacement of lighting fittings for LED replacement of low-temperature cast iron boiler for condensing boiler OSP Fire Station in Pustków - Strachów as part of the investment, the following are planned: replacement of lighting fixtures for LED ones, insulation and waterproofing of foundation walls together with a bump block, replacement of an old energy-saving boiler for a boiler condensing with a new central heating installation and hot water (English)
    0 references

    Identifiers

    RPPK.03.02.00-18-0057/16
    0 references