Revision history of "Expansion of DW 977 Gorlice – State border: Reconstruction of the bridge on the Sękówka creek in Sękowa" (Q112966)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

14 June 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3619:36, 2 March 2023DG Regio talk contribs 86,207 bytes +1,017 Changed label, description and/or aliases in da, lv, it, bg, ro, sk, et, cs, pt, de, sv, lt, ga, sl, hu, es, hr, mt, fr, fi, nl, el, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 13:0113:01, 27 July 2022DG Regio talk contribs 83,077 bytes +53,978 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:1420:14, 1 December 2021DG Regio talk contribs 17,162 bytes +2,954 Created claim: summary (P836): Le contrat a pour objet la construction d’une structure en béton armé à une seule travée comprimée sur le ruisseau Sękówka le long de la route provinciale no 977, ainsi que la construction d’une intersection rond-point d’entrée sur le côté nord de l’installation et la construction d’une piste cyclable.Les principaux paramètres de l’objet du pont après l’extension de la classe A, classe de route à l’intérieur de l’objet: G largeur de la chaussée:...
  • curprev 20:1420:14, 1 December 2021DG Regio talk contribs 14,208 bytes +176 Changed label, description and/or aliases in fr: translated_label

26 December 2020

29 October 2020

20 October 2020

  • curprev 14:3414:34, 20 October 2020DG Regio talk contribs 14,477 bytes +168 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3414:34, 20 October 2020DG Regio talk contribs 14,309 bytes −178 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3414:34, 20 October 2020DG Regio talk contribs 14,487 bytes +2,768 Created claim: summary (P836): The object of the contract is the construction of a single-span bridge facility compressed on the Sękówka creek in the course of Voivodeship Road No.977 together with the construction of 3 inlet crossroads of type roundabout on the north side of the object and the construction of a bicycle path.The main parameters for the bridge object after the extension of the load class A, the road class within the facility: G width of the road: min. 8,0 m 0,...
  • curprev 14:3414:34, 20 October 2020DG Regio talk contribs 11,719 bytes −2,159 Removed claim: summary (P836): The subject of the contract is the construction of a bridge object of a gladle with compressed concrete, which has been compressed into the area of the Skęówka during a provincial road No 977 with the construction of the 3 roundabout inlet intersection on the northern side of the site and the path path. the main parameters for the bridge structure after the development class A, the road class during the facility: G width of road: 8.0 m 0,53,5 ...

25 September 2020

24 September 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1408:14, 10 March 2020DG Regio talk contribs 12,594 bytes +2,159 Created claim: summary (P836): The subject of the contract is the construction of a bridge object of a gladle with compressed concrete, which has been compressed into the area of the Skęówka during a provincial road No 977 with the construction of the 3 roundabout inlet intersection on the northern side of the site and the path path. the main parameters for the bridge structure after the development class A, the road class during the facility: G width of road: 8.0 m 0,53,5 3,...

24 February 2020

18 February 2020

31 January 2020

14 January 2020