Revision history of "Development of Klimkówka Reservoir" (Q112961)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

20 March 2024

15 January 2024

13 December 2023

6 July 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3619:36, 2 March 2023DG Regio talk contribs 82,104 bytes +1,312 Changed label, description and/or aliases in it, da, lv, sl, sk, fi, et, de, ro, hu, lt, pt, nl, fr, sv, el, ga, cs, hr, bg, mt, es, and other parts

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:4515:45, 2 July 2022DG Regio talk contribs 78,679 bytes +50,081 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0720:07, 1 December 2021DG Regio talk contribs 16,819 bytes +3,026 Created claim: summary (P836): Dans le cadre du projet, deux principales activités d’investissement seront menées, à savoir le développement de la côte du lac Klimkówka, qui comprendra: la régulation et le profilage de la rive en longueur. 350mb avec une couchette à 3 étages avec une fonction de sécurité et d’assise d’une piste cyclable avec une surface asphaltée longue. 350mb 4 connecteurs entre le quai et le trottoir sous la forme d’un trottoir de béton 15 plages d’escalier...
  • curprev 20:0720:07, 1 December 2021DG Regio talk contribs 13,793 bytes +98 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 14:3414:34, 20 October 2020DG Regio talk contribs 14,134 bytes +94 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 14:3414:34, 20 October 2020DG Regio talk contribs 14,040 bytes −93 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 14:3414:34, 20 October 2020DG Regio talk contribs 14,133 bytes +2,554 Created claim: summary (P836): As part of the project, 2 main investment activities will be carried out, i.e.:The management of the coast of Klimkówka Lake, which assumes: about regulation and profiling of the shore by length. 350mb with a 3-degree wharf with a safety and recreational asphalt pavement function long. 350mb 4 connectors between the wharf and the path in the form of a pavement with concrete cube 15 beaches of compact reinforced concrete stairs, finished with a c...
  • curprev 14:3414:34, 20 October 2020DG Regio talk contribs 11,579 bytes −2,191 Removed claim: summary (P836): The project will carry out 2 main investment activities, i.e. the management of the Lake Klimkówka coast, which involves regulating and profiling the bank with a long distance. 350Mb, together with the execution of 3 gradual overquay of a safety function, and a rest cycle path for the asphaltic pavement 350Mb 4 fittings between shore and a path in the form of a pavement stone from a concrete 15 beaches of the compact concrete beach staircase,...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

10 March 2020

  • curprev 08:1408:14, 10 March 2020DG Regio talk contribs 12,480 bytes +2,191 Created claim: summary (P836): The project will carry out 2 main investment activities, i.e. the management of the Lake Klimkówka coast, which involves regulating and profiling the bank with a long distance. 350Mb, together with the execution of 3 gradual overquay of a safety function, and a rest cycle path for the asphaltic pavement 350Mb 4 fittings between shore and a path in the form of a pavement stone from a concrete 15 beaches of the compact concrete beach staircase, fi...

24 February 2020

18 February 2020

31 January 2020

14 January 2020