Revision history of "Development of a scattering furnace for firing porcelain and ceramics" (Q11274)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

11 June 2023

17 February 2023

2 July 2022

  • curprev 15:4115:41, 2 July 2022DG Regio talk contribs 47,519 bytes +27,456 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

12 December 2021

2 December 2021

  • curprev 08:1908:19, 2 December 2021DG Regio talk contribs 15,639 bytes +1,335 Created claim: summary (P836): Das Projekt konzentriert sich auf die Entwicklung von Brenngeräten für Keramik und Porzellan, die den spezifizierten technischen, technologischen und Kapazitätsbedarf und Produktionsanforderungen gerecht werden. Das Ergebnis des Projekts wird ein Prototyp der Ausrüstung für effektive Porzellanfeuerung sein – ein neu entwickelter Tunnelbrennerofen mit Optimierung des thermischen Prozesses einschließlich einer entwickelten hochmodernen automatisie...
  • curprev 08:1908:19, 2 December 2021DG Regio talk contribs 14,304 bytes +128 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 09:1309:13, 28 November 2021DG Regio talk contribs 14,176 bytes +1,316 Created claim: summary (P836): Le projet est axé sur le développement d’équipements de combustion pour la céramique et la porcelaine, qui répondront aux besoins techniques, technologiques, de capacité et de production spécifiés. Le résultat du projet sera un prototype d’équipement pour une cuisson efficace de la porcelaine — un nouveau four de brûleur tunnel avec optimisation du processus thermique, y compris un système de contrôle automatisé très moderne, le soi-disant modul...
  • curprev 09:1309:13, 28 November 2021DG Regio talk contribs 12,860 bytes +146 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 15:2815:28, 22 October 2020DG Regio talk contribs 13,163 bytes +1,288 Created claim: summary (P836): The project is focused on the development of firing equipment for ceramics and porcelain burning, which will meet the specified technical, technological and capacity needs and production requirements. The result of the project will be a prototype device for efficient firing of porcelain – a newly developed tunnel junction furnace with optimisation of heat process including developed highly modern automated control system, so-called custom intell...
  • curprev 15:2815:28, 22 October 2020DG Regio talk contribs 11,875 bytes −792 Removed claim: summary (P836): The project is aimed at developing a burning device for burning ceramic and porcelain which meets defined technical, technological and capacity needs and production requirements. The project will result in a prototype of an efficient porcelain plant — newly developed tunnel furnace with optimisation of the thermal process including a highly modern automated driving system, known as a module owned by the braince. a., remove_old_english_translation
  • curprev 06:4406:44, 22 October 2020DG Regio talk contribs 12,667 bytes +128 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 06:4406:44, 22 October 2020DG Regio talk contribs 12,539 bytes −128 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

6 June 2020

25 March 2020

26 February 2020

  • curprev 07:3907:39, 26 February 2020DG Regio talk contribs 11,376 bytes +792 Created claim: summary (P836): The project is aimed at developing a burning device for burning ceramic and porcelain which meets defined technical, technological and capacity needs and production requirements. The project will result in a prototype of an efficient porcelain plant — newly developed tunnel furnace with optimisation of the thermal process including a highly modern automated driving system, known as a module owned by the braince. a., Adding English summary

17 February 2020

12 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020