Revision history of "Construction and reconstruction of the collective water supply and sewage system of Gorlicka Land Municipalities" (Q112705)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

23 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 23:3823:38, 2 March 2023DG Regio talk contribs 81,843 bytes +20,305 Changed label, description and/or aliases in bg, cs, da, de, el, es, et, fi, fr, ga, hr, hu, it, lt, lv, mt, nl, pt, ro, sk, sl, sv, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 12:5112:51, 27 July 2022DG Regio talk contribs 59,426 bytes +31,828 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0020:00, 1 December 2021DG Regio talk contribs 15,073 bytes +1,919 Created claim: summary (P836): Le projet comprendra: la construction d’un réseau d’approvisionnement en eau dans la ville de Lipinki, Rozdziele et Kryg à Lipinka, d’une longueur de 10 783,9 m, dont 152 m en dehors de la zone de l’agglomération, ainsi que l’installation d’un conteneur SUW, la reconstruction du réseau existant d’approvisionnement en eau à Bobów à Bobów, la construction d’un réseau d’eau dans la ville de Gorkie, l’approvisionnement en eau dans la municipalité de...
  • curprev 20:0020:00, 1 December 2021DG Regio talk contribs 13,154 bytes +212 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:4112:41, 20 October 2020DG Regio talk contribs 13,383 bytes +174 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:4112:41, 20 October 2020DG Regio talk contribs 13,209 bytes −202 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:4112:41, 20 October 2020DG Regio talk contribs 13,411 bytes +1,569 Created claim: summary (P836): As part of the project, the following will be carried out: in the rest of the distance, in the distance of 2600.180 m. in the distance of 2600.180 in the distance of 5 m, in the distance of 2600.1767 m, in the distance of 5,2 m, in the distance of 5 m, in the distance of 5 m, in the distance of 5 m, in the distance of 1767 m. The project fully responds to the essential needs of the municipalities associated with the ZGZGGGGReisation of the proje...
  • curprev 12:4112:41, 20 October 2020DG Regio talk contribs 11,842 bytes −1,076 Removed claim: summary (P836): The following will be carried out as part of the project: construction of water mains in m.Lipka, Rozdzle and Kryg in Lipno in the length of 10 783.9 m outside the agglomeration area including the installation of a container SUW reconstruction of the existing water supply network in M. Bobow, 152 m in length. The project is fully in line with the essential needs of the municipalities that are members of the project, using traditional technolog...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0312:03, 9 March 2020DG Regio talk contribs 11,634 bytes +1,076 Created claim: summary (P836): The following will be carried out as part of the project: construction of water mains in m.Lipka, Rozdzle and Kryg in Lipno in the length of 10 783.9 m outside the agglomeration area including the installation of a container SUW reconstruction of the existing water supply network in M. Bobow, 152 m in length. The project is fully in line with the essential needs of the municipalities that are members of the project, using traditional technologie...

24 February 2020

18 February 2020

31 January 2020

14 January 2020