Revision history of "Construction of sanitary sewage system in ratów agglomeration – stage II" (Q112682)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 23:3823:38, 2 March 2023DG Regio talk contribs 88,290 bytes +5,811 Changed label, description and/or aliases in bg, cs, da, de, el, es, et, fi, fr, ga, hr, hu, it, lt, lv, mt, nl, pt, ro, sk, sl, sv, and other parts

26 October 2022

21 October 2022

27 July 2022

  • curprev 12:5112:51, 27 July 2022DG Regio talk contribs 80,376 bytes +50,565 Changed label, description and/or aliases in et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv, nl, fr, de, it, es, and other parts: Adding translations: et, lt, hr, el, sk, fi, hu, cs, lv, ga, sl, bg, mt, pt, da, ro, sv,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 19:5919:59, 1 December 2021DG Regio talk contribs 17,128 bytes +3,219 Created claim: summary (P836): Le champ d’application de l’investissement en question comprend: — Collecteur de décharge en PE fi 110 mm tuyaux d’une longueur — 3676 mb — Détecteur d’extrusion de PE fi 90 mm tuyaux de longueur — 2350 mb — PE fi 75 mm collecteur de décharge de longueur — 1456 mb — collecteur de décharge PE fi 63 mm avec longueur — 479 mb — collecteur de décharge PE fi 50 mm avec longueur — 4181 mb — Détecteur d’expansion de tuyaux PE fi 200 mm — 35 mb — puits...
  • curprev 19:5919:59, 1 December 2021DG Regio talk contribs 13,909 bytes +167 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 14,183 bytes +136 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 14,047 bytes −145 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 14,192 bytes +2,395 Created claim: summary (P836): The scope of the investment is: 479 m – 479 m – 75 mm long – 1456 mb – Pressing collector with pipes PE fi 63 mm long – 479 mb – Pressing collector with pipes PE fi 50 mm length – 4181 mb – Expansion collector from PE pipes 200 mm – 35 mb – 1200 mb – 995 mm of air supply unit – 4181 mb – Expansion collector from PE pipes 200 mm – 35 mb – venting well — Domestic sewage pumping plant PE DN 800-191 pcs – PE DN 1000-1 pcs – Power supply of NN pumpin...
  • curprev 12:4012:40, 20 October 2020DG Regio talk contribs 11,797 bytes −2,225 Removed claim: summary (P836): The scope of the investment in question consists of: — piston collector of EP pipes fi 110 mm, with a length of — 3676 mb — piston collector from EP pipes fi 90 mm, with a length of — 2350 mb — piston collector from EP pipes fi 75 mm length — 1456 mb — compressor station from EP pipes fi 63 mm — 479 mb — compressor station from EP pipes fi 50 mm — 4181 mb — compressor station from EP pipes 200 mm — 35 mb — Odra station from EP tubes 1200x5 1/4...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 12:0212:02, 9 March 2020DG Regio talk contribs 12,738 bytes +2,225 Created claim: summary (P836): The scope of the investment in question consists of: — piston collector of EP pipes fi 110 mm, with a length of — 3676 mb — piston collector from EP pipes fi 90 mm, with a length of — 2350 mb — piston collector from EP pipes fi 75 mm length — 1456 mb — compressor station from EP pipes fi 63 mm — 479 mb — compressor station from EP pipes fi 50 mm — 4181 mb — compressor station from EP pipes 200 mm — 35 mb — Odra station from EP tubes 1200x5 1/40/...

24 February 2020

18 February 2020

31 January 2020

14 January 2020