Revision history of "Improving the energy efficiency of PPHU LYNX Bogdan Ryś through thermal modernisation of the building, replacement of packaging lines for bulk products, replacement of lighting for energy efficient and installation of photovoltaic power plants with a cap" (Q112144)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3319:33, 2 March 2023DG Regio talk contribs 69,538 bytes +746 Changed label, description and/or aliases in da, it, et, sk, ga, fi, hr, lt, ro, es, hu, pt, fr, bg, lv, sv, el, nl, de, sl, mt, cs, and other parts

26 October 2022

25 October 2022

21 October 2022

2 July 2022

  • curprev 15:2715:27, 2 July 2022DG Regio talk contribs 66,672 bytes +41,956 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0120:01, 1 December 2021DG Regio talk contribs 15,224 bytes +2,137 Created claim: summary (P836): L’objectif du projet est d’accroître l’efficacité énergétique dans une entreprise grâce à la modernisation thermique du bâtiment, au remplacement des lignes d’emballage des produits, à l’éclairage pour un éclairage économe en énergie et à l’utilisation accrue des sources d’énergie renouvelables. L’énergie générée par l’installation 8 262,42 kWh sera utilisée pour les opérations de l’entreprise.Durée du projet 2e trimestre 2019 au III 2020. Le de...
  • curprev 20:0120:01, 1 December 2021DG Regio talk contribs 13,087 bytes +362 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:5510:55, 20 October 2020DG Regio talk contribs 13,166 bytes +332 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5510:55, 20 October 2020DG Regio talk contribs 12,834 bytes −302 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5510:55, 20 October 2020DG Regio talk contribs 13,136 bytes +1,864 Created claim: summary (P836): The aim of the project is to increase energy efficiency in 1 of the company through thermal modernisation of the building, replacement of product packaging lines, lighting for energy efficient and increasing the use of renewable energy sources. The energy generated by the installation of 8262.42 kWh will be used for the company’s operations.The duration of the project II quarter 2019 to III 2020. The applicant shall have all the necessary author...
  • curprev 10:5510:55, 20 October 2020DG Regio talk contribs 11,272 bytes −1,475 Removed claim: summary (P836): The aim of the project is to increase energy efficiency in 1 enterprises by means of thermo-modernisation of the building, replacing product packaging lines, lighting on energy efficient and increasing the use of renewable energy sources. The installation of energy by the installation of 8 262.42 kWh will be used for the company’s operations. The applicant shall have all the necessary permits indicating full legal preparedness. The project wil...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3811:38, 9 March 2020DG Regio talk contribs 11,474 bytes +1,475 Created claim: summary (P836): The aim of the project is to increase energy efficiency in 1 enterprises by means of thermo-modernisation of the building, replacing product packaging lines, lighting on energy efficient and increasing the use of renewable energy sources. The installation of energy by the installation of 8 262.42 kWh will be used for the company’s operations. The applicant shall have all the necessary permits indicating full legal preparedness. The project will...

24 February 2020

18 February 2020

31 January 2020

14 January 2020