Revision history of "Construction and modernisation of the power grid with voltage SN and nN enabling connection of electricity generation units from RES in the Limanowski district" (Q112115)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 March 2024

15 January 2024

13 December 2023

12 June 2023

24 May 2023

2 March 2023

  • curprev 19:3319:33, 2 March 2023DG Regio talk contribs 60,424 bytes −1,963 Changed label, description and/or aliases in lv, ro, it, fr, da, es, cs, lt, ga, et, sk, fi, de, hu, sv, bg, hr, sl, nl, pt, el, mt, and other parts

3 December 2022

26 October 2022

21 October 2022

2 July 2022

  • curprev 15:2715:27, 2 July 2022DG Regio talk contribs 59,053 bytes +36,793 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 20:0220:02, 1 December 2021DG Regio talk contribs 14,259 bytes +1,826 Created claim: summary (P836): L’objectif du projet est de moderniser les infrastructures énergétiques non adaptées pour répondre aux charges prévues. La modernisation consistera en le remplacement des tronçons du réseau basse et moyenne tension par de nouvelles lignes aériennes et câbles avec des sections transversales accrues, et l’infrastructure d’accompagnement sera remplacée. Cela augmentera la capacité du réseau électrique de 0,150 MW et la capacité de connecter de nouv...
  • curprev 20:0220:02, 1 December 2021DG Regio talk contribs 12,433 bytes +260 Changed label, description and/or aliases in fr: translated_label

29 October 2020

20 October 2020

  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 12,614 bytes +221 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 12,393 bytes −242 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 12,635 bytes +1,670 Created claim: summary (P836): The aim of the project is to modernise the unsuitable energy infrastructure to the planned burdens. Upgrading will consist of replacing sections of low and medium-voltage networks with new overhead and cable lines with increased cross-sections, as well as replacement of the associated infrastructure. This will increase the capacity of the electricity grid by 0.150 MW and the capacity to connect new energy sources by 50 units.For economic and tec...
  • curprev 10:5410:54, 20 October 2020DG Regio talk contribs 10,965 bytes −1,074 Removed claim: summary (P836): The aim of the project is to modernise the energy infrastructure that has not been used up to the planned load. Modernisation will consist of the exchange of sections of low and medium voltage networks on new overhead lines and on the cable of the increased cross-sections and the associated infrastructure. This will increase the capacity of the electricity grid by 0.150 MW and the ability to connect new energy sources by 50. This upgrade has b...

24 September 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

9 March 2020

  • curprev 11:3711:37, 9 March 2020DG Regio talk contribs 10,748 bytes +1,074 Created claim: summary (P836): The aim of the project is to modernise the energy infrastructure that has not been used up to the planned load. Modernisation will consist of the exchange of sections of low and medium voltage networks on new overhead lines and on the cable of the increased cross-sections and the associated infrastructure. This will increase the capacity of the electricity grid by 0.150 MW and the ability to connect new energy sources by 50. This upgrade has bee...

24 February 2020

18 February 2020

31 January 2020

14 January 2020