Revision history of "Tests on electromagnetic compatibility" (Q10811)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

11 June 2023

17 February 2023

2 July 2022

  • curprev 14:0114:01, 2 July 2022DG Regio talk contribs 40,744 bytes +22,349 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et, cs, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, pl, sl, lt, lv, bg, hu, ga, sv, et,

15 January 2022

14 January 2022

13 December 2021

2 December 2021

  • curprev 07:4907:49, 2 December 2021DG Regio talk contribs 14,800 bytes +1,127 Created claim: summary (P836): Auf der Grundlage der Zusammenarbeit mit der ETL ZČU in Pilsen werden Tests nach den einschlägigen Normen für Durchflussmesser von ELIS PLZE-a. s. durchgeführt. Die Tests werden in der Überprüfung von Prototypen bestehen, um sicherzustellen, dass sie in verschiedenen Umgebungen korrekt funktionieren., translated_summary
  • curprev 07:4907:49, 2 December 2021DG Regio talk contribs 13,673 bytes +108 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 09:0409:04, 28 November 2021DG Regio talk contribs 13,565 bytes +1,123 Created claim: summary (P836): Sur la base de la coopération avec l’ETL ZČU à Pilsen, les essais seront effectués conformément aux normes applicables aux débitmètres d’ELIS PLZE’a. s.. Les essais consisteront à vérifier les prototypes pour s’assurer qu’ils fonctionnent correctement dans différents environnements., translated_summary
  • curprev 09:0409:04, 28 November 2021DG Regio talk contribs 12,442 bytes +103 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 15:1215:12, 22 October 2020DG Regio talk contribs 12,788 bytes +1,082 Created claim: summary (P836): On the basis of cooperation with the ETL ZČU in Pilsen, tests will be carried out according to the relevant standards on the flow meters of ELIS PLZEN a. s. The tests will consist of verifying prototypes that they perform correctly in different environments. a., translated_summary
  • curprev 15:1215:12, 22 October 2020DG Regio talk contribs 11,706 bytes −656 Removed claim: summary (P836): Based on the cooperation with ETL of the ZČU in Pilsen, tests shall be carried out in accordance with the applicable standards on ELIS PLZEŇ meters. The tests will be based on the verification of prototypes as to whether they are operating correctly in a variety of environments. a., remove_old_english_translation
  • curprev 07:3007:30, 22 October 2020DG Regio talk contribs 12,362 bytes +97 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 07:3007:30, 22 October 2020DG Regio talk contribs 12,265 bytes −67 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

6 June 2020

25 March 2020

26 February 2020

  • curprev 07:2507:25, 26 February 2020DG Regio talk contribs 11,041 bytes +656 Created claim: summary (P836): Based on the cooperation with ETL of the ZČU in Pilsen, tests shall be carried out in accordance with the applicable standards on ELIS PLZEŇ meters. The tests will be based on the verification of prototypes as to whether they are operating correctly in a variety of environments. a., Adding English summary

17 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020