Revision history of "Re ODRA – social and economic activation of post-factory sites in Nowa Sól" (Q100952)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)

17 October 2020

  • curprev 15:4415:44, 17 October 2020DG Regio talk contribs 15,523 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4415:44, 17 October 2020DG Regio talk contribs 15,667 bytes +2,941 Created claim: summary (P836): The project “RE-ODRA – social and economic activation of post-factory areas in Nowa Sól” is related to revitalisation of the industrial areas of the former Odra factory together with the immediate surroundings, as part of the tasks set out in the Local Programme for the Regeneration of the City of Nowa Sól for the years 2016-2023. As part of the task, it will be demolished, rebuilt and modernised, as well as an expanded tower building with adapt...
  • curprev 15:4415:44, 17 October 2020DG Regio talk contribs 12,726 bytes −2,411 Removed claim: summary (P836): The RE ODRA project, which involves putting Nowa Sól’s factory sites to use for social and economic purposes, is linked to the regeneration of the former Odra factory’s industrial sites and their immediate surroundings, in the framework of the objectives set out in the Nowa Sól local urban regeneration programme for 2016-2023. The task will be demolished, restored and modernised, as well as a large building tower, with an adaptation to the soc...

23 September 2020

16 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:2809:28, 6 March 2020DG Regio talk contribs 13,426 bytes +2,411 Created claim: summary (P836): The RE ODRA project, which involves putting Nowa Sól’s factory sites to use for social and economic purposes, is linked to the regeneration of the former Odra factory’s industrial sites and their immediate surroundings, in the framework of the objectives set out in the Nowa Sól local urban regeneration programme for 2016-2023. The task will be demolished, restored and modernised, as well as a large building tower, with an adaptation to the socia...

24 February 2020

18 February 2020

31 January 2020

14 January 2020

(newest | oldest) View ( | older 50) (20 | 50 | 100 | 250 | 500)