Revision history of "Re ODRA – social and economic activation of post-factory sites in Nowa Sól" (Q100952)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 April 2024

  • curprev 06:5706:57, 11 April 2024Wildmax talk contribs 92,686 bytes 0 Changed claim: summary (P836): O projeto «RE-ODRA — ativação social e económica de áreas pós-fábricas em Nowa Sól» está relacionado com a revitalização das áreas industriais da antiga fábrica Odra juntamente com o entorno imediato, como parte das tarefas estabelecidas no Programa de Revitalização Local da Cidade de Nowa Sól para os anos 2016-2023. Como parte da tarefa, o edifício da torre será demolido, reconstruído e modernizado com adaptação à função de ativação social, eco...
  • curprev 06:5606:56, 11 April 2024Wildmax talk contribs 92,686 bytes 0 Changed [pt] label: Re ODRA — ativação social e económica de pós-fábricas no Sal Nowa

7 March 2024

15 January 2024

13 December 2023

14 September 2023

14 June 2023

12 June 2023

24 May 2023

10 March 2023

9 March 2023

2 March 2023

  • curprev 19:0519:05, 2 March 2023DG Regio talk contribs 90,642 bytes −92 Changed label, description and/or aliases in da, it, sk, lv, ga, ro, sl, et, sv, fi, cs, de, mt, lt, hr, el, es, hu, pt, fr, bg, nl, and other parts

8 December 2022

20 October 2022

2 July 2022

  • curprev 11:3411:34, 2 July 2022DG Regio talk contribs 90,010 bytes +56,929 Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,

31 May 2022

8 February 2022

18 January 2022

15 January 2022

17 December 2021

7 December 2021

1 December 2021

  • curprev 08:3408:34, 1 December 2021DG Regio talk contribs 18,560 bytes +3,202 Created claim: summary (P836): Le projet «RE-ODRA — activation sociale et économique des zones post-fabricantes de Nowa Sól» est lié à la revitalisation des sites industriels de l’ancienne usine d’Oder ainsi qu’aux environs les plus proches, dans le cadre des tâches définies dans le programme de revitalisation locale de la ville de Nowa Sól pour les années 2016-2023. Dans le cadre de la tâche, la construction de la tour sera démolie, reconstruite et modernisée, adaptée à la f...
  • curprev 08:3408:34, 1 December 2021DG Regio talk contribs 15,358 bytes +138 Changed label, description and/or aliases in fr: translated_label

29 October 2020

17 October 2020

  • curprev 15:4415:44, 17 October 2020DG Regio talk contribs 15,659 bytes +136 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 15:4415:44, 17 October 2020DG Regio talk contribs 15,523 bytes −144 Changed label, description and/or aliases in 1 language: remove_english_label
  • curprev 15:4415:44, 17 October 2020DG Regio talk contribs 15,667 bytes +2,941 Created claim: summary (P836): The project “RE-ODRA – social and economic activation of post-factory areas in Nowa Sól” is related to revitalisation of the industrial areas of the former Odra factory together with the immediate surroundings, as part of the tasks set out in the Local Programme for the Regeneration of the City of Nowa Sól for the years 2016-2023. As part of the task, it will be demolished, rebuilt and modernised, as well as an expanded tower building with adapt...
  • curprev 15:4415:44, 17 October 2020DG Regio talk contribs 12,726 bytes −2,411 Removed claim: summary (P836): The RE ODRA project, which involves putting Nowa Sól’s factory sites to use for social and economic purposes, is linked to the regeneration of the former Odra factory’s industrial sites and their immediate surroundings, in the framework of the objectives set out in the Nowa Sól local urban regeneration programme for 2016-2023. The task will be demolished, restored and modernised, as well as a large building tower, with an adaptation to the soc...

23 September 2020

16 July 2020

22 June 2020

10 June 2020

7 June 2020

26 March 2020

6 March 2020

  • curprev 09:2809:28, 6 March 2020DG Regio talk contribs 13,426 bytes +2,411 Created claim: summary (P836): The RE ODRA project, which involves putting Nowa Sól’s factory sites to use for social and economic purposes, is linked to the regeneration of the former Odra factory’s industrial sites and their immediate surroundings, in the framework of the objectives set out in the Nowa Sól local urban regeneration programme for 2016-2023. The task will be demolished, restored and modernised, as well as a large building tower, with an adaptation to the socia...

24 February 2020

18 February 2020

31 January 2020

14 January 2020