Revision history of "Streamlining the production of concrete products" (Q10012)

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2024

15 January 2024

11 June 2023

20 February 2023

17 February 2023

2 July 2022

  • curprev 11:1211:12, 2 July 2022DG Regio talk contribs 47,680 bytes +27,663 Changed label, description and/or aliases in sk, hr, ro, mt, et, da, hu, ga, fi, el, bg, pl, sl, lv, pt, lt, sv, cs, nl, fr, de, it, es, and other parts: Adding translations: sk, hr, ro, mt, et, da, hu, ga, fi, el, bg, pl, sl, lv, pt, lt, sv,

24 February 2022

15 January 2022

14 January 2022

12 December 2021

2 December 2021

  • curprev 07:4507:45, 2 December 2021DG Regio talk contribs 16,310 bytes +1,417 Created claim: summary (P836): Das Projekt wird die Mischtechnik und das gesamte Mischzentrum der Plattenfabrik in Ostrožská Nové Ves modernisieren. In den Räumlichkeiten des Mischzentrums wird die Herstellung einer neuen Betonmischung, die sich als bessere Eigenschaften erwiesen hat als die Mischung unter aktuellen Bedingungen gemischt und anschließend aus dieser Mischung die Herstellung von Betonprodukten. Die geschätzten Gesamtkosten belaufen sich auf 4,9 Mio. CZK. Für die...
  • curprev 07:4507:45, 2 December 2021DG Regio talk contribs 14,893 bytes +102 Changed label, description and/or aliases in de: translated_label

28 November 2021

  • curprev 07:2907:29, 28 November 2021DG Regio talk contribs 14,791 bytes +1,439 Created claim: summary (P836): Le projet modernisera l’équipement de mélange et l’ensemble du centre de mélange de l’usine de panneaux d’Ostrožská Nové Ves. Dans les locaux du centre de mélange sera la production d’un nouveau mélange de béton qui a prouvé de meilleures propriétés que le mélange mélangé dans les conditions actuelles et par la suite de ce mélange la production de produits en béton. Le coût total est estimé à 4,9 millions de couronnes tchèques. Une nouvelle form...
  • curprev 07:2907:29, 28 November 2021DG Regio talk contribs 13,352 bytes +113 Changed label, description and/or aliases in fr: translated_label

27 December 2020

28 October 2020

22 October 2020

  • curprev 14:5314:53, 22 October 2020DG Regio talk contribs 13,692 bytes +1,360 Created claim: summary (P836): The project will modernise the mixing equipment and the whole mixing centre in Ostrožské Nové Ves. In the premises of the mixing centre there will be production of a new concrete mixture which has proven to be better than the mixture mixed under current conditions and subsequently from this mixture the production of concrete products. Total estimated costs amount to CZK 4.9 million. A newly developed formula, which has been thoroughly tested in...
  • curprev 14:5314:53, 22 October 2020DG Regio talk contribs 12,332 bytes −935 Removed claim: summary (P836): The project will lead to the modernisation of the mixers and the whole mixing centre of the SWG in Ostrovský Nové Vi. The mixing centre will include the production of a new concrete mixture which has demonstrably superior characteristics than the mixture mixed under the current conditions and subsequently manufacture of concrete products from this mixture. The total estimated cost amounts to CZK 4,9 million. For the manufacture of concrete pro...
  • curprev 06:2606:26, 22 October 2020DG Regio talk contribs 13,267 bytes +107 Changed label, description and/or aliases in 1 language: translated_label
  • curprev 06:2606:26, 22 October 2020DG Regio talk contribs 13,160 bytes −113 Changed label, description and/or aliases in 1 language: remove_english_label

15 July 2020

19 June 2020

6 June 2020

25 March 2020

3 March 2020

25 February 2020

  • curprev 16:2716:27, 25 February 2020DG Regio talk contribs 11,571 bytes +935 Created claim: summary (P836): The project will lead to the modernisation of the mixers and the whole mixing centre of the SWG in Ostrovský Nové Vi. The mixing centre will include the production of a new concrete mixture which has demonstrably superior characteristics than the mixture mixed under the current conditions and subsequently manufacture of concrete products from this mixture. The total estimated cost amounts to CZK 4,9 million. For the manufacture of concrete produ...

17 February 2020

13 February 2020

11 February 2020

6 February 2020

30 January 2020

28 January 2020

16 January 2020

10 January 2020