Energy renovation of the building Primary School Dr Fing Tuđana located in Rijeka 2, Lički Osik (Q2733151)

From EU Knowledge Graph
Revision as of 14:59, 21 June 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q2733151 in Croatia
Language Label Description Also known as
English
Energy renovation of the building Primary School Dr Fing Tuđana located in Rijeka 2, Lički Osik
Project Q2733151 in Croatia

    Statements

    0 references
    2,122,559.13 Croatian kuna
    0 references
    275,932.69 Euro
    2 June 2021
    0 references
    4,431,109.19 Croatian kuna
    0 references
    576,044.19 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    16 October 2018
    0 references
    31 August 2021
    0 references
    GRAD GOSPIĆ
    0 references
    Q2758324 (Deleted Item)
    0 references

    44°32'48.95"N, 15°22'30.18"E
    0 references
    53000
    0 references
    Cilj projekta je smanjiti negativne učinke na okoliš kroz provedbu 4 mjere energetske učinkovitosti na zgradi OŠ Dr. Franje Tuđmana na adresi Riječka 2, Lički Osik u svrhu ostvarenja doprinosa smanjenju potrošnje energije u zgradama javnog sektora. Mjere energetske učinkovitosti su: (1) Vanjska ovojnica, (2) strop prema negrijanom, stropovi prema tavanu, (3) zamjena kotla na biomasu i (4) zamjena rasvjetnih tijela. Provedbom navedenih mjera očekuje se smanjenje godišnje potrošnje primarne energije za 791.605,92 kWh i smanjenje CO2 za 190 t/god te se uvodi korištenje OIE u predmetnoj zgradi. (Croatian)
    0 references
    The project aims to reduce the negative environmental impacts through the implementation of the 4 energy efficiency measures on the building by Dr. Francis Tuđana located in Rijeka 2, Lički Osik in order to contribute to reducing energy consumption in public sector buildings. Energy efficiency measures shall be: (1) External envelope, (2) ceiling bordering unheated, ceilings, (3) replacement of biomass boiler and (4) replacement of luminaires. These measures are expected to reduce annual primary energy consumption by 791 605.92 kWh and reduce CO2 by 190 t/yr and introduce the use of RES in the building concerned. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.2.1.04.0366
    0 references