Regulation of the transport infrastructure (Q2734941)

From EU Knowledge Graph
Revision as of 14:56, 21 June 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Jump to navigation Jump to search
Project Q2734941 in Croatia
Language Label Description Also known as
English
Regulation of the transport infrastructure
Project Q2734941 in Croatia

    Statements

    0 references
    82,920.54 Croatian kuna
    0 references
    10,779.67 Euro
    2 June 2021
    0 references
    135,778.4 Croatian kuna
    0 references
    17,651.19 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    3 July 2020
    0 references
    2 December 2020
    0 references
    Grad Beli Manastir
    0 references

    45°46'22.33"N, 18°36'38.70"E
    0 references
    31300
    0 references
    Projektom će se obnoviti dvije infrastrukture kao dio fizičke, gospodarske i socijalne regeneracije depriviranih područja – rekonstrukcija prometnica i izgradnja pješačko-biciklističke staze uz državnu cestu D7 u prigradskom naselju Branjin Vrh. Plan je rekonstruirati Kneževačku ulice u duljini oko 70 m i priključak na ulicu S.S. Kranjčevića u duljini oko 13 m, te izgraditi kolni prilaz novoobnovljenom društvenom domu u Branjinom Vrhu i izgraditi pješačko-biciklističke staze u duljini oko 125 m te time povećati sigurnost sudionika u prometu te poboljšati postojeća vizura prigradskog naselja. (Croatian)
    0 references
    The project will renovate the two infrastructures as part of the physical, economic and social regeneration of the depopulated areas — road reconstruction and the construction of a pedestrian cycle cycle in addition to the state road D7 in the Baden Vrh district road. The plan is reconstructed by the Princess Street of approximately 70 m in length and in connection to the streets of S.S. Kranjčević for a length of about 13 m, and build the road side approach to a newly renewed social home in the Bvulnerable Summit and build walking cycle lanes around 125 m in length, and thereby enhance the safety of road users, and improve the existing quizzes on urban settlements. (English)
    3 June 2021
    0 references

    Identifiers

    KK.08.2.1.07.0013
    0 references