No label defined (Q2744034)

From EU Knowledge Graph
Revision as of 11:50, 17 June 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The county road 565 has a total length of 31.232 km and has its beginning at the entrance of Jiana Mare village, Jiana commune, the intersection with DJ 606 and takes place on the route Mileni, Burila Mare, Crivina, Vrancea, Batoti to the Mică Danube. The aim is to build a road structure in order to meet the need for current and forward-looking traffic, water leakage and traffic safety elements. The DJ565 route, respectively Mileni-int DN56C-Bur...)
Jump to navigation Jump to search
Project Q2744034 in Romania
Language Label Description Also known as
English
No label defined
Project Q2744034 in Romania

    Statements

    0 references
    4,814,470.53 Romanian Leu
    0 references
    962,894.1060000001 Euro
    15 June 2021
    0 references
    5,664,082.970000001 Romanian Leu
    0 references
    1,132,816.5940000003 Euro
    15 June 2021
    0 references
    0.85 percent
    0 references
    4 February 2016
    0 references
    1 January 2021
    0 references
    UAT JUDETUL MEHEDINTI
    0 references
    Drumul judeţean 565 are o lungime totală de 31,232 km şi îşi are începutul la intrarea în localitatea Jiana Mare, comuna Jiana, întersecţia cu DJ 606 şi se desfăşoară pe traseul Mileni, Burila Mare, Crivina, Vrancea, Batoti până la Dunărea Mică. Se urmareste realizarea unei structuri rutiere astfel încât să răspundă necesităţii traficului actual şi de perspectivă, elementele privind scurgerea apelor şi cele privind siguranţa circulaţiei. Traseul DJ565, respectiv Intrare sat Mileni-int DN56C-Burila Mare (int. DN56B)-Crivina-Vrancea – Batoţi (int. DN56B) asigura conectivitatea indirecta la reteaua TEN-T prin DN 56B, DN 56C. Pentru sectorul DJ 565 km 8+632 – 9+632, km 20+000 – 21+000 Vrancea L= 2km si tronsonul DJ 565 Crivina (asfalt)- Vrancea (la asfalt) km 16+845 – 20+000, L=3,155 km, proiectarea a avut in vedere urmatoarele obiective: - corectarea in plan si spatiu a elementelor geometrice ale traseului existent, astfel incat sa se asigure conditiile tehnice necesare pentru o viteza de proiectare de 40km/ora; - stabilirea axei proiectate astfel incat sa se foloseasca intr-o masura cat mai mare traseul existent; - realizarea lucrarilor de infrastructura; - executarea unei structuri rutiere performante, cu imbracaminte bituminoasa moderna; -refacerea si completarea dispozitivelor de scurgere a apelor meteorice (santuri, rigole, inlocuirea podetelor degradate, prevederea unor podete noi); - realizarea acostamentelor consolidate din balast; -amenajarea drumurilor laterale si acceselor la proprietati; - executarea lucrarilor privind siguranta circulatiei rutiere. (Romanian)
    0 references
    The county road 565 has a total length of 31.232 km and has its beginning at the entrance of Jiana Mare village, Jiana commune, the intersection with DJ 606 and takes place on the route Mileni, Burila Mare, Crivina, Vrancea, Batoti to the Mică Danube. The aim is to build a road structure in order to meet the need for current and forward-looking traffic, water leakage and traffic safety elements. The DJ565 route, respectively Mileni-int DN56C-Burila Mare village entrance (int. DN56B)-Crivina-Vrancea – Battery (int. DN56B) ensures indirect connectivity to the TEN-T network through DN 56B, DN 56C. For DJ sector 565 km 8+ 632-9+ 632, km 20+ 000-21+ 000 Vrancea L= 2 km and section DJ 565 Crivina (asphalt) – Vrancea (at asphalt) km 16+ 845-20+ 000, L=3.155 km, the design took into account the following objectives: — correction in plane and space of the geometric elements of the existing route, so as to ensure the technical conditions necessary for a design speed of 40 km/h; — Establishment of the axis designed so as to use the existing route as much as possible; — realisation of infrastructure works; — execution of a high-performance road structure with modern bituminous clothing; — redeploying and completing the leakage devices of meteoric waters (wells, ditches, replacement of degraded floors, provision of new floors); — realisation of consolidated ballast moorings; — arranging side roads and access to properties; — execution of road safety works. (English)
    17 June 2021
    0 references
    MH, Burila Mare, Devesel
    0 references

    Identifiers

    126190
    0 references