Donji batini recycling yard (Q2734545)

From EU Knowledge Graph
Revision as of 07:54, 4 June 2021 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q2734545 in Croatia
Language Label Description Also known as
English
Donji batini recycling yard
Project Q2734545 in Croatia

    Statements

    0 references
    3,706,619.83 Croatian kuna
    0 references
    481,860.58 Euro
    2 June 2021
    0 references
    4,360,729.22 Croatian kuna
    0 references
    566,894.8 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    28 October 2020
    0 references
    28 October 2022
    0 references
    GRAD ZLATAR
    0 references
    0 references

    46°5'33.9"N, 16°4'38.4"E
    0 references
    49250
    0 references
    Reciklažno dvorište će se izgraditi za potrebe Grada Zlatara, odnosno 19 naselja unutar Grada: Belec, Borkovec, Cetinovec, Donja Batina, Donja Selnica, Ervenik Zlatarski, Gornja Batina, Gornja Selnica, Juranščina, Ladislavec, Martinščina, Petruševec, Ratkovec, Repno, Ščrbinec, Vižanovec, Završje Belečko, Zlatar, Znož za ukupno 6096 stanovnika, u svrhu sustavnog gospodarenja otpadom i zaštite okoliša. Izgradnjom će se osigurati zasebno prikupljanje sirovina, korištenje otpada te smanjenje količine otpada odloženog na odlagalište. Rezultati projekta su izgrađeno i opremljeno reciklažno dvorište, informirano 4572 stanovnika, tj. 75% od ukupnog broja u 19 naselja kroz edukativne aktivnosti te se očekuje odlaganje 35 tona otpada u godini dana. (Croatian)
    0 references
    A recycling yard will be built to meet the needs of the town of goldsmiths ‘city’, i.e. 19 settlements within the City of: Blec, Borkovec, Cetinovec, Lower Batina, Lower Selnica, Upper Selnica, Juranščina, Ladislav čričec, Martinšččina, Peroševec, Rattkovec, Repni, Ščirbovc, Final Belko, Zlaptar, Znož for a total of 6096 inhabitants, for the purposes of systematic waste management and environmental protection. Construction will ensure a separate collection of raw materials, use of waste and reduce the amount of waste landfilled. The project results were built and equipped with a recycling yard, 4572 inhabitants, i.e. 75 % of the total in 19, and 35 tonnes of waste are expected to be deposited in one year. (English)
    3 June 2021
    0 references

    Identifiers

    KK.06.3.1.16.0052
    0 references