Energy renovation of the building of the primary school Dr Andrija Mohorovičić, district school of Jušić and the Matulji care school, Jusšići Centre at Jušike 127, Jurani (Q2733080)
Jump to navigation
Jump to search
Project Q2733080 in Croatia
Language | Label | Description | Also known as |
---|---|---|---|
English | Energy renovation of the building of the primary school Dr Andrija Mohorovičić, district school of Jušić and the Matulji care school, Jusšići Centre at Jušike 127, Jurani |
Project Q2733080 in Croatia |
Statements
258,481.17 Croatian kuna
0 references
633,365.63 Croatian kuna
0 references
85.0 percent
0 references
14 September 2018
0 references
14 September 2020
0 references
OPĆINA MATULJI
0 references
51211
0 references
Osnovna škola Dr. Andrija Mohorovičić, područna škola Jušići i Dječji vrtić Matulji, objekt Jušići smješteni su u objektu neadekvatnih konstrukcijskih elemenata u smislu energetske učinkovitosti. Rekonstrukcijom objekta te uvođenjem korištenja sustava obnovljivih izvora energije za potrebe vrtića i škole pridonijet će se smanjenju godišnje potrošnje primarne energije u objektu (javnoj zgradi), poboljšanju uvjeta boravka djece i zaposlenih. Na objektu se planira provesti mjera toplinske izolacije vanjskih zidova međukatnih konstrukcija prema tavanu, krovova i međukatnih konstrukcija iznad ventiliranog prostora, zamjena stolarije čime će se postići značajne uštede u potrošnji energije Qh,nd 60.585,25 kWh/a (77,66%). (Croatian)
0 references
Dr Andrija Mohorovičič, Regional School of Jušići and Dječji Garulja Matulja, houses of the establishment are located in the establishment of inadequate design elements in terms of energy efficiency. The reconstruction of the facility and the introduction of the use of renewable energy systems for kindergartens and schools will contribute to reducing annual primary energy consumption in the building (public building), improving the conditions of residence of children and workers. The installation is planned to measure the thermal insulation of the external walls of intermediate structures towards attic, roofs and intermediate structures above the ventilated compartment, the replacement of the joinery, thus leading to significant savings in the consumption of energy Qh, nd 60 585.25 kWh/a (77.66 %). (English)
3 June 2021
0 references
Identifiers
KK.04.2.1.04.0253
0 references