No label defined (Q2733031)

From EU Knowledge Graph
Revision as of 12:52, 3 June 2021 by DG Regio (talk | contribs) (‎Created claim: summary (P836): The project provides for savings of 51.16 % per year of energy needed for heating to be achieved with: (a) Resolution of the roof above the heated space (positioning of the wool replacement with mineral wool replacement), b) Insulation of the external wall of the thermal space of the ETICS phase by system c) The design is intended to remove existing floor layers and floor insulation of the floor and D) the replacement of wooden joinery of carpen...)
Jump to navigation Jump to search
Project Q2733031 in Croatia
Language Label Description Also known as
English
No label defined
Project Q2733031 in Croatia

    Statements

    0 references
    543,587.5 Croatian kuna
    0 references
    70,666.38 Euro
    2 June 2021
    0 references
    1,054,434.38 Croatian kuna
    0 references
    137,076.47 Euro
    2 June 2021
    0 references
    85.0 percent
    0 references
    7 September 2018
    0 references
    7 November 2020
    0 references
    OSNOVNA ŠKOLA ČAZMA
    0 references

    45°44'55.36"N, 16°36'47.23"E
    0 references
    43240
    0 references
    Projektom je predviđeno ostvarenje uštede godišnje potrebne energije za grijanje od 51,16 % što se postiže s: a) Sanacija krova iznad grijanog prostora (postavljanje mineralbe vune zamjena pokrova), b) Izolacija vanjskog zida grijanog prostora etics fasadnjm sustavom c) Projektom je predviđeno uklanjanje postojećih slojeva poda i postava toplinske izolacije poda d) zamjena drvene stolarije novom PVC stolarijom e) rampa za savladavanje visinskih razlika u skladu s Pravilnikom o osiguranju pristupačnosti građevina osobama s invaliditetom i smanjene pokretljivosti f) zamjena rasvjetnih tijela LED rasvjetom g) ugradnja plinskog kondenzacijskog kotla h) ugradnja toplovodnog sustava radijatorskog grijanja i) ugradnja ventilacija kuhinje. (Croatian)
    0 references
    The project provides for savings of 51.16 % per year of energy needed for heating to be achieved with: (a) Resolution of the roof above the heated space (positioning of the wool replacement with mineral wool replacement), b) Insulation of the external wall of the thermal space of the ETICS phase by system c) The design is intended to remove existing floor layers and floor insulation of the floor and D) the replacement of wooden joinery of carpentry of wood with new PVC joinery (s) under the Ordinance on ensuring accessibility of buildings to persons with disabilities and reduced mobility (f) replacement of LED lighting g) installation of gas condensing boiler (h), installation of the hot-water radiator and the galley ventilation installation. (English)
    3 June 2021
    0 references

    Identifiers

    KK.04.2.1.04.0168
    0 references